José Muralha, António Batista, Luís Lamas, Juan Mata & Carlos Serra
the design, construction, first filling of the reservoir, and operational phases. This included safety control activities and studies related to rock mechanics, hydraulics, and structural engineering. During construction, LNEC was involved in the definition of the monitoring plan[5,6] of the monitoring instrumentation.
and overseeing the installation
Figure 1. General plan of the dam as designed in 2017[3]
Figure 2. Downstream view of the Alto Tâmega dam after the first filling of the reservoir in 2024