search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
LNEC support to the design adaptation of Alto Tâmega dam due to the rockslide on the right bank slope


ensured the safe and successful completion of this complex project. Insights gained will serve as a valuable reference for future infrastructure projects, particularly those involving challenging geotechnical conditions.


Acknowledgements The authors acknowledge Iberdrola for providing the data and information for this work and for allowing it to be published.


References


[1] ATACI (Aqualogus-Cenor-Iberinsa), 2011 – H.E. Alto Tâmega. Design. General memory. Annex 8 – Stability, dimensioning and structural safety (in Portuguese). Volume 1 – Dam. January 2011.


[2] ATACI (Aqualogus-Cenor-Iberinsa), 2011a – H.E. Alto Tâmega. Design. Annex 2. Geological and geotecnical studies (in Spanish), January 2011.


[3] GRANELL INGENIEROS CONSULTORES, 2017 – H.E. Alto Tâmega. Execution project. Dam (in Portuguese). Ref. 1862/11/121001, rev0, February 2017.


[4] GRANELL INGENIEROS CONSULTORES, 2013 – H.E. Alto Tâmega. Dam. Review of geology and rock mass parameters. Ref. 1862/OA/211001, Rev1, November 2013.


[5] LNEC, 2011 – Alto Tâmega dam. Monitoring plan and specific monitoring plan during the first filling of the reservoir (in Portuguese). Report 52/2011, February 2011.


[6] LNEC, 2017 – Alto Tâmega dam. Adaptation of the monitoring plan to the dam to be built (second geometry definition) (in Portuguese). Report 346/2017, October 2017.


[7] GRANELL INGENIEROS CONSULTORES, 2020 – H.E. Alto Tâmega. Integrated memory of the Alto Tâmega project review (in Portuguese). Ref. 1862-INFT-00072, Rev0, February 2020.


[8] LNEC, 2020 - Alto Tâmega dam. Opinion on the design adaptation, due to the landslide in the right bank slope (in Portuguese). Report 143/2020. April 2020.


Vol XXXIII Issue 3 | Dam Engineering | 139


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100