José Muralha, António Batista, Luís Lamas, Juan Mata & Carlos Serra
Figure 12. Horizontal cross-sections of the adjusted dam insertion surface, including the new concrete structure to fill the right bank gap (adapted from[7]
)
Figure 13. Extension of the right bank foundation gallery at elevation 237.5m, to monitor faults F13 and F20 and enhance drainage of the rock mass foundation (adapted from[7]