PROJECTS


Aerial view


plants and it has been associated to sewage treatment plants discharging ammonia. Due to this, the non-compliance of nearby sewage treatment plants located upstream and high ammonia content in the above-mentioned rivers has caused water contamination at the Bukit Tampoi water intake point resulting in plant shut down and water crisis. As such, removing or stripping the ammonia will help to reduce the impact. However, a more holistic approach is needed whereby all other sources of pollution resulting in ammonia generation needs to addressed and resolved.


This project is needed in order to improve and to achieve better standard of treated effluent by complying with Category 1, Environmental Quality Act 1974, Environmental Quality (Sewage) Regulations 2009, Second Schedule (Regulation 7) – Effluent Standard ‘A’.


REGIONALISATION The study demarcated an area of approximately 80 square kilometres in the rapidly urbanising Cheras-Kajang corridor. This catchment area includes 232 small discrete sewage treatment plants, serving individual housing estates and numerous institutional premises. A majority of these plants, built decades earlier, was not designed to effectively reduce


60


ammoniacal nitrogen loads into Sungai Langat. As such, the operations of water treatment plants that drew raw water from the river were compromised.


The proposal embodies the concept of regionalisation of the sewerage infrastructure. This is done by diverting raw sewage entering each of the small plants, and from identified government premises and schools, into larger municipal sewers. These would then all lead to a centralised and more extensive sewage treatment facility.


The concept involved a conveyance system comprising 98 kilometres of gravity sewers, 11 network pump stations with a corresponding 10 kilometres of force mains. The network culminates in a centralised municipal plant with a hydraulic capacity of 207 MLD [million litres per day]. The capacity and the sludge process of the centralised plant are designed to effectively strip ammoniacal nitrogen while meeting all requisite parameter discharge limits stipulated under Category 1, Environmental Quality Act 1974.


PROJECT SCOPE The scope comprises major structures and connections. The first is a conveyance concept with optimum use of


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124