FIRE SAFETY
In normal use, the fire damper is held open by a fusible link.
When the temperature across the fusible link reaches 72 °C, the blade is released and a mechanical spring closes the damper blade.
Above: Figure 2. Without a fire damper in place, fire and smoke are able to spread rapidly through the ducts into other fire compartments.
Above right: Figure 3. Operation of a fire damper.
requirements for fire dampers. This provides the mechanism for conformity marking against the Construction Product Regulation (CPR) 305/2011, and sets out the requirements for factory production control, documentation, and labelling, as expected from an AVCP 1 system product.
n BS EN 1366-2: Fire resistance tests for service installations – Part 2: Fire dampers, defining the standards that fire dampers must be tested to, including essential characteristics like (integrity (E), insulation (I), and leakage (S) of the fire damper, when installed in, on, or remote from, a supporting construction.
n BS EN 15882-2: Extended application of results from fire resistance tests for service installations – Part 2: Fire dampers, governing effective installation and guidance where buildings are adapted.
The ICB furnace at Trox’s International Centre for Fire Protection Technology in Neukirchen-Vluyn in Germany is ‘large enough to test even the largest tunnel dampers used for extracting smoke from tunnels, or from an underground metro or railway station’.
n BS EN 13501-3: Fire classification of construction products and building elements – Part 3: Classification using data from fire resistance tests on products and elements used in building service installations: fire resisting ducts and fire dampers. This is used by the Notified Body to collate all test data, and provide the final classification against the essential characteristics, for each installation type, within the criteria defined.
Building Safety Act compliance Importantly, requirements placed upon individuals with responsibility for buildings incorporating fire dampers have been redefined in recent years. Dame Judith Hackitt’s independent review following the fire at Grenfell Tower (Building a Safer Future, published in May 2018) contributed findings which have been incorporated into the new Building Safety Act, which became law in April 2022. A significant amount of secondary legislation has
been introduced since that time, and guidelines specific to fire dampers were published in the National Association of Air Duct Specialists guidance document (NAAD22). This document (covering design, selection, installation, and maintenance of fire dampers) is available for free download at
https://www.naaduk.co.uk/naad22- guidance-document-app/. The reforms to existing legislation have changed
the way in which custodians of buildings must think, both during design and after construction of buildings. There are important updates for buildings of all types, with specific additional responsibilities for Higher-Risk Buildings (HRBs). This category encompasses buildings more than 18 metres in height, or with at least seven storeys. Hospitals, care homes, and buildings containing at least two residential units also fit within this category. HRBs were required to be registered with the Building Safety Regulator by 30 September 2023. Since 1 October 2023 all new-builds categorised as Higher- Risk Buildings must to be registered with the Building Safety Regulator prior to occupation. The testing regimes for fire dampers are dictated by the categorisation of the building involved, with additional responsibilities for those designated as Higher-Risk.
Dutyholders’ increased responsibilities Firstly, under the Building Safety Act 2022, responsibilities have increased for all Dutyholders – for example individuals and organisations that commission, design, construct, or refurbish buildings. Those involved must now go beyond the requirements of the Construction (Design and Management) Regulations (CDM), ensuring that projects are not only safe to build, use, and maintain, but also that they are safe to occupy. Secondly, the Act introduced the role of Accountable
Person, referring to individuals/organisations that own, or have responsibility for, buildings during occupation, as well as those responsible for the repair or maintenance of common parts of a building – for example corridors and lobbies. Therefore, responsibility falls on Dutyholders to select ‘adequate and proper materials’ that are ‘appropriate for the circumstances in which they are used’, and to integrate these within the building design to facilitate them to be ‘applied, used, or fixed, so as to adequately perform the functions for which they are designed’. This must be achieved while ensuring that routine inspection and maintenance throughout the lifetime of the building can be achieved. In addition to reviewing damper types, NAAD22
provides guidance on minimum regulatory requirements for routine maintenance, testing, and inspection, of installed dampers. It also covers installation, testing, and commissioning, of dampers during initial installation, as well as considerations for the correct design for, and
74 Health Estate Journal October 2025
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184