EDUCATIONAL FACILITIES REVAMPING THE ROOFTOP When the 2400m2 roof of Ivanhoe College needed rescuing after years of surface damage,
collaboration between project managers Make Consulting, and contractors Central Roofing and Sika Liquid Plastics ensured the project came in on time and on budget.
Before
Background Ivanhoe College is a specialist technology academy for 11- 18 year old students in Ashby-de-la-Zouch, Leicestershire. The school aims to provide a ‘rich and creative teaching and learning community’ in a 'safe and caring environment’. They converted to Academy Status in 2012.
The campus is made up of various inter-connected buildings of varying heights and has a number of roof lights. The 2,400m2
roof was in poor condition with
multiple patch repairs and there were leaks due to failed detailing. Insufficient drainage had also caused ponding water on the roof, putting the existing surface at increased risk of further damage.
Project Requirement The school needed to access funding to enable a roof refurbishment project to take place so its management team worked with specialist consultancy make Consulting and Sika Liquid Plastics to develop a Condition Improvement Fund (CIF) bid based on clear roof condition, affordability and performance criteria.
As the project had to be carried out during term time in a live school environment, it was important that the roofing system chosen could be installed with minimal health and safety risk or disruption. Consequently, Sika Liquid Plastics cold-applied, virtually odourless Decothane Ultra liquid system was selected.
It was also vital to upgrade the insulation as an integral part of the roofing project to bring the building’s thermal performance into line with current building regulations.
58 | TOMORROW’S FM
After
The project also had to address the issues with detailing and replace the existing roof lights while making modifications to the roof to resolve the lack of drainage and overcome the problems with standing water.
Sika Liquid Plastics Solution Sika Liquid Plastics’ area technical representative carried out a condition survey and developed a full technical specification as an integral part of the funding bid.
Quality Assured (QA) contractor, Central Roofing, was appointed to carry out the works and mooted the possibility of installing tapered insulation to resolve the drainage issues by creating falls to the problem roof areas. However, as there was not sufficient budget for this approach, Sika Liquid Plastics’ area technical representative designed tapered gutters using 130mm Decotherm insulation board, enabling a low cost solution to achieve effective drainage.
The roof refurbishment was largely carried out as an overlay, with only the areas where the existing insulation had perished stripped back to the substrate. The existing roof lights were replaced with custom- fabricated Decolight roof lights, fabricated to meet the exact measurements of the existing aperture. 130mm Decotherm insulation board was adhered to the prepared roof surface, followed by Sika Liquid Plastics S-VAP 7000 self-adhesive membrane. The Decothane Ultra 25 cold-applied liquid system was then applied to the roof to complete the system.
http://gbr.liquidplastics.sika.com twitter.com/TomorrowsFM
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100