WHAT’S NEW? Workplace Innovator Joins JLL
JLL has announced the appointment of Lee Daniels as UK Head of Workplace.
Lee joins JLL from global design and architecture firm HOK. He has extensive experience in developing and leading workplace services for major blue-chip organisations across a variety of sectors in national and international markets.
Sue Asprey-Price, UK Head of Corporate Solutions, commented: “Lee is an innovator within the workplace sector and a transformational hire for our business. Lee’s expertise in design, change management and technology will provide the much needed impetus for corporates as they seek to transform their workplaces.
Lee Daniels, UK Head of Workplace, added: “This is an exciting time to be joining JLL as the Workplace team undergoes a period of impressive growth. I am looking forward to working with Sue and the team in my new role and bringing my experience to partner with a roster of dynamic and interesting clients. I’m excited to join such a progressive business.”
www.jll.co.uk/united-kingdom/en-gb No Mission is Impossible
for PPS Power PPSPower’s engineers sprang into action to respond when a serious power-outage threatened the data centre of one of the UK’s major travel companies.
PPSPower was called out recently when what was described as an ‘almighty bang’ was heard as one of two back-up generators at the site failed when switching back to mains power. Operatives at the site were carrying out work on electrical infrastructure switch gear.
The site has two generators that are synced together to provide power to the whole building in cases when mains power is unavailable.
When PPSPower’s engineers were called out and arrived on-site, they discovered that the generator day tank had run out of fuel. The fuel transfer system is electrically driven and without any mains power available automatic fuel transfer between bulk tank and day tank to keep the generators running was not working. The on-site uninterruptible power supply (UPS), which would provide emergency power during input power source or mains power failures, had only 5% of autonomy time, equating to just five minutes of available power supply.
Ian Townson, Technical Manager for PPSPower, said: “When we are called out to work like this we do what is necessary for the client. I wouldn’t describe it as a Mission Impossible but there was obviously a race against the clock and some challenges to restore power and reinstate the fuel transfer system and the generators. As the UPS would only supply power for five minutes this meant that engineers had to work safely but at speed to beat the clock.”
With data at risk, PPSPower engineers arranged a temporary supply from the UPS in order to connect to the fuel transfer system, managing to transfer enough fuel to allow the main generator to be brought back up and running and supply the building’s power needs, and then manually transferred fuel during the night to ensure a reliable power supply.
The business was reluctant to transfer back to mains power because the original generator fault had not yet been identified but this had the added complication of making it impossible to identify the fault. During the course of this essential repair work, the data centre was powered by only the back- up generators.
PPSPower’s engineers carried out repairs to the fuel transfer system, discovering a defective flow switch, and electrical components.
With power available, on-site data was backed up by transferring it to a site in the United States, allowing the generators to be switched off while repairs to the automatic fuel transfer system were carried out. Once repaired, the generator that originally failed was reinstated, along with the mains supply, before the back-up generators, now in a ready state and capable of operating as specified, were shut down and the building returned to mains power.
PPSPower’s work ensured that no data was lost as a result of the initial power outage, with engineers working through the night to deliver an outstanding service, and that this major travel company can now be confident that their critical systems will operate as expected.
www.ppspower.com 30 | TOMORROW’S FM
twitter.com/TomorrowsFM
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100