search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
A TEXTBOOK FINISH Amtico chooses F. Ball for their new training academy installation.


Products from F. Ball and Co. Ltd., UK manufacturer of flooring adhesives and floor preparation products, have been used to create an A-star flooring finish as part of a refurbishment to create a brand new Amtico training academy in Coventry. These included F. Ball’s Stopgap 300 HD levelling compound and Stopgap P131 general purpose primer. The flooring was installed in what is now the reception area of the training centre.


Firstly, ceramic tiles were removed from the existing concrete subfloor along with remaining adhesive.


A moisture test was then carried out to determine if the subfloor was dry enough to receive floorcoverings. The test indicated that relative humidity (RH) levels in the subfloor were below 75%, and therefore dry enough to continue with the installation without the application of a waterproof surface membrane.


Before the application of a levelling compound, F. Ball’s Stopgap P131 general purpose primer was used. With few exceptions, it is essential to prime a subfloor before the application of a levelling compound or adhesive. Priming absorbent surfaces, such as concrete, with Stopgap P131 helps to promote adhesion and inhibits the unacceptably rapid drying of subsequently applied levelling compounds or adhesives. If a levelling compound dries too quickly, ‘pinholing’ can occur – tiny holes in the levelling compound at the surface, which have the appearance of pinholes or blisters once fully cured.


F. Ball’s Stopgap 300 HD levelling compound was then applied to the prepared subfloor to create a perfectly smooth surface


40 | REFURBISHMENT


ready to receive the Amtico floorcoverings. Stopgap 300 is a heavy-duty, fast-drying levelling compound with excellent self-levelling properties, and is suitable for use over a wide range of absorbent and non-absorbent subfloor types. Its heavy-duty applications make it ideal for use in the reception area of the training academy, where high levels of daily footfall are expected. Applied at a thickness of 3mm, the compound is ready to receive floorcoverings in as little as six hours.


Slate-effect luxury vinyl tiles with beveled edges were then installed over approximately half of the floor area using a solvent-free, temperature tolerant vinyl adhesive with pressure sensitive characteristics. The pressure sensitive qualities of the adhesive meant that floorcoverings were held securely in place whilst the fitter arranged the complex design of different shaped vinyl tiles.


Finally, entryway matting was installed over 50% of the remaining area of the prepared subfloor, next to the doorway leading into the reception area. Light-grey, PVC-backed carpet tiles were installed on the other half of the prepared subfloor.


Commenting on the project, Andy Heath, the main instructor working on the job, said: “The job went extremely well. The end result had to be perfect because it’s the Amtico training centre, and the reception is the first thing people see as they walk in. F. Ball’s products helped us create a high-quality finish, quickly. Stopgap 300 HD is like no other heavy-duty levelling compound I’ve used before. Some heavy-duty levelling compounds are quite difficult to level out. Stopgap 300 HD flows easily.”


www.f-ball.co.uk www.tomorrowscontractfloors.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56