the subfloor and structural building was already nearing completion. We therefore had no influence or input into what slab or subfloor was installed.
“Once on site, we found that a power float floor had been installed, but the surface was cracked and rough in texture. There was also a corridor that was sloping by approximately 40mm from one end to the other.
As a result, we contacted Bostik for their technical expertise to provide a solution on how to prepare the floor ready for the installation of the floorcoverings.”
Bostik’s technical team visited the site and carried out a survey to decide on the best solution. They came to the decision of using a copper grinder across the whole floor to smooth any bumps and give the required finish before it could be primed and levelled.
Once the floor had been prepared using the copper grinder, Bostik Screedmaster One Coat Membrane was applied to suppress any residual moisture in the subfloor.
To rectify the issue of the sloping corridor, Bostik recommended the use of its Screedmaster Deep levelling compound, which can be applied in depths of 5mm to 50mm in a single step. This was done following the application of an even film of Screedmaster Epoxy Primer, which enhanced the bond of the deep fill compound to the subfloor.
TOP MARKS
Bostik has supplied a range of subfloor preparation and adhesive products for use at a primary school
located within a new 1,200-acre urban development in Rugby, Warwickshire.
St Gabriel’s Church of England Academy is the first primary school being built on the new Houlton development, which is situated on the site of the old Rugby Radio Station. The neighbourhood is named after the American town of Houlton, Maine, where the first transatlantic telephone call was received from Rugby Radio Station in 1927. The £4.2m school will have an initial intake of 30 pupils and is expected to grow to 390 by 2021. It features eight classrooms, two halls, kitchen facilities and outdoor play areas.
Midlands Flooring was the main flooring contractor on the job and selected Bostik to supply its Screedmaster One Coat Membrane, Universal Primer, Screedmaster Epoxy Primer, Screedmaster Deep and Screedmaster Flow levelling compounds, as well as the B1 Super Tac Adhesive for use across 13,000m2
of the site.
Dave Wilson, Managing Director for Midlands Flooring, commented: “St Gabriel’s Church of England Academy has been an interesting project for us as we were introduced to the development late in the process, meaning that
26 | SCREEDS & RESINS
After Screedmaster Deep had been applied to the required depths in the corridor area, an additional 3mm layer of Screedmaster Flow was used to give a smooth finish in preparation of the floorcoverings being laid.
Dave Wilson added: “Having previously used Screedmaster Deep, we knew the product was perfect for this situation and would perform to high standards. By only using Bostik products throughout the project, we were confident that we would be 100% satisfied with the finished surface prior to the installation of the flooring.”
In other areas of the site, Bostik Universal Primer was applied to prepare the floor ready for the application of the levelling compound.
The Bostik Screedmaster Flow levelling compound was specified as the site had a minimal water supply and the two-part product comes with a polymer liquid, making it much easier to work with. With exceptional flow and smoothing properties, Screedmaster Flow provided a perfect surface on which to lay the decorative floorcoverings.
Once the levelling compound had dried thoroughly, Bostik B1 Super Tac Adhesive was used to bond the floorcoverings. B1 Adhesive is ideal for use with vinyl, which had been specified throughout the project.
Dave Wilson concluded: “We have worked with Bostik extensively over the years and are impressed with the service they provide. The team is always professional and is willing to go the extra mile to help.”
The Houlton community - which is being developed in phases over the next 20 years - will eventually provide 6,200 new homes, three primary schools, a secondary school, an eight- GP health centre, as well as commercial premises.
www.bostik-profloor.co.uk www.tomorrowscontractfloors.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56