44 PROJECT REPORT: TRANSPORT FACILITIES & PUBLIC REALM


Platform drainage at Historic York Railway Station


stands. Opened in 1839 by the North Midland Railway, the structure only served trains to and from the south and the northern coalfields. However by 1873, as more passenger and goods lines were built into York, a larger station, from which trains could gain access from all directions, was needed.


T


he original York Railway Station was built within the City Walls, adjacent to where the current station now


Opening in 1877, the new York Station


took three years to rebuild. Designed by the North Eastern Railway’s architect Thomas Prosser, the curved 800ft-long train-shed roof, supported by iron columns, arched 42ft above the platforms. The station was immediately hailed as one of the great buildings in Victorian era. At the time, it was the largest railway station in the world with four massive arches and thirteen platforms. Today, the structure still impresses. Serving


the busy East Coast mainline route, primarily between Glasgow Aberdeen, Edinburgh and London it is also a vital cross-route link between Glasgow, Manchester and Liverpool. The station currently copes with around 800 trains and thousands of passengers each week. With so many passengers using the station, the extended platforms, which project out from the original arched structure, are as busy as ever. The platform surfaces have been designed to gently slope inward away from the track so any surface water naturally


drains towards their centre. Effective drainage of these roofed and un-roofed “outer” areas was a major safety consideration. Hauraton RECYFIX®


STANDARD 100


channels were chosen for the slightly curving platforms – see photographs. The 271 metres of channelling installed were made from the company’s tough recycled Polyethylene- Polypropylene (PE-PP), all fitted with Class C 250 ductile iron “heel-safe” gratings finished in a Black anti-oxidisation coating. As each one metre unit only weighs just over 6kg, including the grating, contractor C. Spencer Limited was impressed with the ease and speed of installing the channels as all the units used easily complied with manual lifting regulations.


01582 501380 www.hauraton.co.uk


WWW.ARCHITECTSDATAFILE.CO.UK


ADF OCTOBER 2019


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100