This page contains a Flash digital edition of a book.
YORKSHIRE SPOTLIGHT


FEATURE SPONSOR


CLIENT REPRESENTATION TO WESTERMOST ROUGH


The company provides these services to a variety of projects, including the world’s largest offshore wind farms such as London Array Ltd and is currently delivering client representation and vessel audit services for DONG Energy to the Westermost Rough offshore wind farm, located off the Holderness coast in Yorkshire.


SAFETY FIRST The high risk nature of offshore wind farm construction projects means that safety must be the primary concern. Indeed, Westermost Rough will be one of the first offshore wind farms in the world to use 6MW turbines on such a large scale, with 35 turbines to be constructed at this site. High levels of quality and expertise is essential during the transportation and installation of these turbines to ensure that it is undertaken accurately and safely.


Specialist Marine Consultants Ltd (SMC) based near Scarborough in North Yorkshire specialises in improving safety and quality in the offshore marine energy industry globally.


EXPERIENCE


Having already supplied client representation for DONG Energy on other projects, including Anholt, Walney 1 & 2 and London Array, SMC have been


selected again to provide this service on the Westermost Rough offshore wind farm. SMC’s client representatives observe and record the operations being undertaken to ensure that safety, efficiency and best practice is being maintained at all times.


By ensuring high levels of safety and quality, unnecessary delays should be avoided, which consequently enables the project to run smoothly and efficiently for the client.


FIT FOR PURPOSE


As well as ensuring regulatory and safety compliance during the construction of such projects, it is also essential that the vessels utilised on the project are suitably fit for purpose and meet international industry standards.


These vessels transport a number of personnel every day, to and from the site, in potentially dangerous conditions. Therefore, vessel audits are required to ensure that vessels are safe for the specific task, provide a safe environment for personnel on and around the vessel and cause the least harm on the environment as possible.


EUROPE’S LARGEST


Being Europe’s largest supplier of vessel audits and having extensive experience globally, SMC have been selected to undertake vessel audits for the Westermost Rough and Humber Gateway projects.


Undertaking work on these projects in Yorkshire will mean that SMC has delivered services to every offshore wind farm project in the UK to date, in addition to various European projects.


Specialist Marine Consultants Ltd


18


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100