DATA CENTRE COOLING


Panasonic cools Belfast data centre


One of the main challenges for data centres is coping with cooling and humidity control demands within the building because of the enormous heat gains generated by the large volume of computers and lighting systems – often in operation 24 hours a day, seven days a week. In the case of Concentrix customer engagement centre in Belfast, there was also the added complication of the number of employees on site approaching close to 1500 people.


B


elfast-based Aircon sales and service, which designs, supplies, installs and maintains various air conditioning


solutions, recently installed a combination of Panasonic GHP VRF three-pipe, two-pipe and Split Hi Wall type units to heat and cool the 130,000ft², three storey property at the Concentrix call centre in Belfast. The installation at Concentrix was a very complex and challenging project due to the building’s design and lack of available electrical supply to the site. In addition to the nature of Concentrix’s business, which requires a signifi cant power load for the operations of the building including lighting, computers and servers, the property also needed to provide comfortable conditions for the 1500 employees on site. The team at Aircon’s contracts department, headed up by manager, Stephen McGarry, worked closely with consultants Beattie Flannigan and mechanical contractors, Harvey


Group, to deliver the best possible solution that site conditions would allow.


Ian McFerran, Aircon’s managing director explains: “Quality underpins our entire delivery model, with professionalism and attention to detail being the primary focus. Coupled with competitive and cost-eff ective pricing, the overall package we deliver sets us apart from other market players.”


Due to the design of the building which features low ceiling heights on each fl oor, the team devised a solution based on a larger quantity of indoor units operating at lower capacities. Not only that, the Panasonic DX gas-fi red system provides close to 1.2MW of cooling, using between 20kW and 25kW of electrical input, thus effi ciently providing optimum cooling for the building whilst only drawing a minimal load from the buildings electrical power supply. The equipment specifi ed included the following:  13 Panasonic GHP gas heat pump 3-pipe


outdoor units


 5 Panasonic GHP 2-pipe VRF outdoor units to service AHU DX Systems


 155 Panasonic VRF cassette indoor units to serve all call centre and meeting room areas


 19 Panasonic Split Hi Wall systems to serve various small UPS and comms rooms


 Panasonic centralised and full Modbus BMS control


 Panasonic Air Off Control employed in all call centre area’s to provide a very high sensible heat ratio, 90%+


 All indoor units were sized to meet duties at medium to low fan speeds.


This project benefi ts from a sophisticated solution off ering high performance, is cost- eff ective, energy effi cient and 100% reliable. The team involved worked collectively to supply, design and deliver the perfect solution which saw a seamless installation and subsequent commissioning.


www.acr-news.com November 2019 29


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64