inspectorate website1. All figures referred to in this Chapter can be found in Volume 2 as listed in the table above.


5.


This chapter has taken account of primary relevant guidance provided in the National Policy Statement (NPS) for Renewable Energy Infrastructure (EN-3). The NPS guidance notes relevant to benthic ecology are described in detail in Table 10.3.


10.2 Consultation 6.


Table 10.1 summarises issues raised and advice provided during consultation. Consultation relevant to benthic ecology mainly occurred through three separate processes. Firstly, a scoping opinion was sought from the relevant statutory consultees (The Planning Inspectorate 2012). Secondly, consultation with key statutory consultees was undertaken through the Evidence Plan process (for further detail on the Evidence Plan please refer to Appendix 10.1 and Chapter 6 Environmental Impact Assessment Methodology). Thirdly, although not directed specifically at East Anglia THREE Limited, feedback from consultees on the East Anglia ONE examination process was taken into account where it was considered relevant to this project.


7.


Table 10.1 indicates which section(s) of this or other chapters address the issues raised.


Table 10.1.Consultation Responses Consultee


Date /Document


Scoping Opinion


JNCC and Natural England


November 2012


We note that the potential for Sabellaria spinulosa has been identified through the analysis of this data. With the project being submitted for examination by PINS in 2014, the data at this point will be over 4 years old. We advise that owing to the ephemeral nature of S.spinulosa the age of this data is likely to result in reduced confidence in conclusions relating to the presence or absence of Annex I reef in these areas. We advise that the requirement for further survey should be explored and we would be happy to discuss this further with EAOW.


East Anglia THEE Limited (EATL) have made a commitment to conduct pre construction surveys which will assess the presence of S. spinulosa reef within the proposed East Anglia THREE project.


Comment


Response / where addressed in the PEIR


1 http://infrastructure.planningportal.gov.uk/wp-content/ipc/uploads/projects/EN010025/2.%20Post- Submission/Application%20Documents/Environmental%20Statement/7.3.4b%20Volume%202%20Chapter%20 9%20Benthic%20and%20Epibenthic%20Environment%20(including%20Shellfish)%20Appendices%20(App%209 .1%20-%209.2).pdf


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 10 Benthic Ecology Page 2


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104