This page contains a Flash digital edition of a book.
Impact Decommissioning


Impact 1: Temporary Physical disturbance


The maximum area of disturbance during decommissioning is based on:


1. Removal of 60mgravity base foundations and scour protection calculated as 25,500m2 per foundation (see construction impact 1). Therefore for 106 foundations the maximum area of disturbance would be 2.68km2.


2. Removal of up to two meteorological masts and scour protection, each with a footprint of 2,830m2 and a combined area of 0.01km2.


3. The footprint of the jack-up barge removing 180 foundations (based on a jack up barge footprint of 1,200m2and three movements per foundation) the maximum disturbance would be 0.65km2.


4. Removal of inter-array cable crossing protection 0.0007km2. 5. Removal of cable protection for inter-array, and HVAC export cables between collector and converter station would disturb an area of 0.45km2.


Total decommissioning footprint within the East Anglia THREE site during decommissioning would be approximately 3.80km2 (1.25% of the East Anglia THREE site).


6. Removal of cable protection from the up to 10% of the 508km HVDC export cable: 0.3km2


7. Removal cable protection of up to 2.5% of the up to 112km HVDC 2.5%: 0.02km2.


8. Removal of export cables within the intertidal.


Total decommissioning footprint within the offshore cable corridor would be approximately 0.32km2. (0.03% of the offshore cable corridor)


The overall total footprint is 4.25km2


See construction impact 1 for rationale on the number and size of foundations.


All buried cables would simply be cut at the ends and left in- situ. The removal of cable protection would be agreed with the relevant authority at the time however worst case for disturbance would be its removal. See operation impact 1 for rationale with regard to cable protection calculations.


Key design parameters forming the worst case scenario


Rationale


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 10 Benthic Ecology Page 15


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104