Engineers: Holloway Partnership
Quantity Surveyors and Employer’s Agent: Pembroke Design Ltd Construction Programme: 12 months Open to patients: April 2007
Accommodation is provided for the following occupiers:
Front elevation of Gilfach Goch Primary Care Centre
Pembroke Dock
The Argyle Medical Centre in Pembroke Dock involved the merger of three local GP practices into a homogeneous practice delivering vital premises care services to the local community.
Project Details Local Health Board: Hywel Dda Local Health Board
Third Party Developer: PCD Pembrokeshire Ltd Gross Floor Area: 1600 m2 Construction Cost: Circa £2.3 million Architect: Pembroke Design Ltd
Rear elevation of Gilfach Goch Primary Care Centre
Side elevation of Pembroke Dock Primary Care Centre
Front elevation of Pembroke Dock Primary Care Centre
● The Argyle Medical Group practice of 9 GPs provide General Medical Services to a local patient population of 13,500
● Local Health Community services provided by District Nurses, Health Visitors and Midwives
● Optometrist ● Pharmacy
Ground Floor Plan of Pembroke
Ground Floor Plan of Gilfach Goch Primary Care Centre
THE TERRIER - Autumn 2011
Dock Primary Care Centre
37
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64