Stagecoach Supertram Nunnery Depot April 2012


The Challenge


Existing timber crossings patched with concrete, tarmac and metal plating in places. S&C track and few straight lines.


The Solution


Existing materials replaced with new HoldFast rubber panels, individually cut to fit, to take into account check rails, points;, fishplates; track circuit bonds; and ongoing track maintenance access requirements.


Contractor


Level Crossings Installations (LCI) www.levelcrossinginstallations.co.uk


Visit our gallery at www.HoldFastSolutions.co.uk


PAGE 40 SEPTEMBER 2012


Please contact Mark Coates Smith Mobile: +447970 656143 Fax: +441285 720748 Email: mark@holdfastsolutions.co.uk Rosehill Polymers Ltd manufacture the HoldFast system on behalf of HoldFast Level Crossings Ltd


on time and on budget


Complex for Some, Easy for HoldFast


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60