Wherever the site, call up HoldFast.
Stagecoach Supertram Nunnery Depot April 2012
The Challenge
Existing timber crossings patched with concrete, tarmac and metal plating in places. S&C track and few straight lines.
The Solution
Existing materials replaced with new HoldFast rubber panels, individually cut to fit, to take into account check rails, points;, fishplates; track circuit bonds; and ongoing track maintenance access requirements.
Contractor
Level Crossings Installations (LCI)
www.levelcrossinginstallations.co.uk
Visit our gallery at
www.HoldFastSolutions.co.uk
PAGE 40 SEPTEMBER 2012
Please contact Mark Coates Smith Mobile: +447970 656143 Fax: +441285 720748 Email:
mark@holdfastsolutions.co.uk Rosehill Polymers Ltd manufacture the HoldFast system on behalf of HoldFast Level Crossings Ltd
on time and on budget
Complex for Some, Easy for HoldFast
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60