search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Fire & Risk Management London Road, Moreton in Marsh Gloucestershire GL56 0RH +44 (0)1608 812 532 www.frmjournal.com


Editor William Roszczyk wroszczyk@thefpa.co.uk


Production Editor Jan Wassall


jwassall@thefpa.co.uk advertising@thefpa.co.uk


Managing Director Jonathan O’Neill OBE


RISCAuthority Director Dr Jim Glockling


Advertising Jamie Wyatt


Foreword W


PEFC Certified


This product is from sustainably managed forests and controlled sources


PEFC/16-33-254 www.pefc.org


EditorWilliam Roszczykintroduces this month’s edition


ELCOME TO the June 2019 issue of F&RM, which this month focuses on building risks, with sub themes of lifecycle safety and cladding solutions.


We thought it prudent, given that it will have been two


years this month since the Grenfell Tower disaster, that this issue should focus on the continuing risks posed by buildings, their lifecycles and the materials that they are constructed with. The average person might have assumed that changes had been made in the interim since 72 people tragically lost their lives, but as we are all too aware, progress has been slow. The only way to ensure that something is done is to continue with what the sector has been doing: keep focusing on fi xing the pressing issues and press the government over what can be changed. Many buildings that shouldn’t be are still at risk from fi re, notably high rises, and the fi re safety and protection sector is best placed to continue to put the pressure on government and other sectors to make the changes needed to protect life and property. Starting our features off this month is a piece from


ISSN 1757-1324


The views expressed in articles by outside contributors are those of the authors and not necessarily those of The Fire Protection Association. Claims made for products and services in news items, articles or adverts do not imply endorsement by The Fire Protection Association. No responsibility is accepted for such views or claims.


Want to write for us?


Articles can cover aspects related to fire, business and resilience planning, protection of lives and buildings, or insurance.


Our minimum word count is 1,500 words – we also require a two to three sentence author bio and print quality author headshot, for our contributors’ page, and high resolution images to support your piece. We do not run overt advertorial – the best way to proceed is to explain general principles or technologies in the context of fire and other risks, with mention of relevant products in a case study.


If you’d like to write for F&RM, please contact us at frm@thefpa.co.uk


Zeroignition’s Glyn Coates, in which he discusses failures commonly found in construction methods, and what can and needs to be done to ensure that buildings remain safe. Following this, Justin Francis of Queensland Fire and Rescue introduces an outline for a new high rise safety rating system for buildings worldwide, to help improve fire safety and save lives. Moving to lifecycle safety, in order to keep pace with the


rapid shift in building design, materials and specifi cation, the fire protection industry is changing and Sherwin-Williams’ Bob Glendenning examines the issues that surround this. Specifi cally looking at cladding solutions, Chris Hall investigates modern ventilated rainscreen systems and the solutions needed to prevent the spread of smoke and fi re. Also, in light of the devastating fi re at Notre-Dame Cathedral


in Paris in April, we have a very timely current affairs article from Terry Crowdy of the Historic Royal Palaces. Terry’s article underlines the value of effective salvage planning and operations, and shows us how it’s done at the Historic Royal Palaces. You’ll notice that our centre pages feature our preview


focus on FIREX 2019, including the FPA’s own Infozone seminar theatre and programme. Make sure you turn to page 28 to see which talks you might want to attend – we’ll be reporting from the show, so please let us know if you’d like to meet. Our July/August issue will focus on transport, aviation risks,


buses, trains and electric cars, and will also feature event reports from FIREX, the RISCAuthority Manchester seminar, and the latest FPA seminar looking at the implementation of the Hackitt Review. If you’d like to contribute an article to a future edition, please get in touch with me at wroszczyk@thefpa.co.uk


4 JUNE 2019 www.frmjournal.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60