COMPRESSOR TECHNOLOGY
Take care of your compressor
Green Point, BITZER’s compressor remanufacturing and service support arm, has urged refrigeration contractors and end-users to be aware of the risks of uneven wear and burn-out on multi-compressor packs.
T
he problem of oneven wear and burn-out occurs on packs with relatively simple control systems whose default run sequence results in extended running hours for certain compressors, while other units remain underused or even idle for extended periods. It is also an issue where secondary compressors are repeatedly brought into service for short periods to support the primary compressor when additional capacity is required. Such on-off off cycling over time causes stress to motors, which can result in overheating and, in the extreme cases, complete burn-out.
Will Pribyl, Green Point UK general manager, said: “On many multi- compressor packs, a small number of compressors often end up doing much of the work due to the run sequencing control and load profile. This is obviously not ideal and invites trouble. Add to this the problem of compressor cycling on secondary units, and it is an all-too familiar cause of breakdown, with all the consequent costs of downtime and product loss. We see this often in our remanufacturing operations, however it is almost entirely avoidable through planned rotation of compressors.”
He added: “It is a lot less expensive to rotate compressors, removing worn units and remanufacturing and replacing them on a planned basis, rather than waiting for the pack to break down and having to replace the failed unit in an emergency.”
To address the problem, Green Point is introducing a planned compressor rotation service for multi-compressor packs as part of its support for contractors, ensuring plant remains operational and continues to perform efficiently throughout its lifetime.
The approach is aimed particularly at business critical areas such as data centre cooling, the
22 September 2019
food and drink industry, and high value process applications such as pharmaceuticals and the chemical, oil and gas industries.
“The ideal rotation interval will depend on the operating conditions and running hours for the pack. However, we can advise contractors so they can in turn formulate a sensible rotation programme for their end user customer,” said Will Pribyl.
“As the work is planned, we make sure all necessary replacement components are in stock, so turn-around is as fast as possible, usually just a couple of days. However, as the outgoing compressor is removed on site, a like-for- like replacement is immediately installed, so downtime is minimised and system capacity remains unaffected.”
The company recently completed a compressor
rotation project through distributor RSL Ireland for an application in Ireland – involving two packs, each with four semi-hermetic screw compressors, serving a blast-freezer in a fish processing facility. One of the lead compressors had failed, prompting an investigation which showed that disproportionate run-time was the cause.
Paul Lynch, RSL Ireland technical manager, said: “The packs had been converted from R404A to R409A a year earlier, but that was not the reason for the failure. The breakdown was due to the pack control disproportionately loading the lead compressor. Green Point was able to supply an immediate exchange compressor to replace the damaged unit, and carry out a follow-up compressor rotation project to avoid similar failures in future.”
www.acr-news.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56