search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
SUPPLEMENT ENCLOSURE & SAFETY SOLUTIONS


DATA AND WORKFLOWS for Industry 4.0


The new Rittal VX25 large enclosure system supports the control and


switchgear engineering industry on the path towards Industry 4.0


T


he new system combines a physical enclosure with its digital twin, ensuring it will meet all future digital needs – from online


configuration and engineering to assembly, automation and tracking. Rittal has created a system capable of merging real and physical


workflows – delivering significant improvements in efficiency for panel builders and switchgear manufacturers. The VX25 ensures 3D data is available at maximum quality,


consistently. The digital element supports control and switchgear manufacturers across every process along their value chain. This means electrical planning, mechanical design, purchasing, cost calculation and manufacturing, as well as every other area of switchgear construction, can always access complete, high-quality data. That capability then opens up new ways for end-users to digitise their processes in accordance with Industry 4.0.


MAXIMUM DATA QUALITY Efficient designing and planning is supported through the easy download of detailed, validated, 3D CAD data (Rittal website or EPLAN data portal), the flexible data transmission in all common CAD systems (a total of 70 formats), the mechatronic engineering with CAE/CAD, the generation of enclosure layouts with EPLAN Pro Panel, as well as data classification according to eClass and ETIM.


ERROR-FREE CONFIGURATION The web-based Rittal Configuration System (RiCS) enables simple and error-free configuration of the VX25 and the desired installation components – even without any knowledge of CAD. The required planning security is ensured by integrated plausibility


checks that provide direct feedback, ensuring that the solution has a high level of reliability. Rittal has also simplified the ordering processes by linking it to the online shop, as well as with web-based conversion tools to support a changeover from the TS 8 to the VX25 large enclosure system.


EASY TRACKING Validated configuration and engineering results then provide the basis for the automatic controlling of machines at plant construction production facilities. The VX25 panels are equipped with a QR code to optimise the value creation processes within control and switchgear engineering. Production control and traceability is conceivable in future within control and switchgear engineering. Using the QR code, it will be possible to align the components of the enclosure to a specific order or customer project. This will allow the components to be tracked through the complete workflow, to be assigned to the correct editing programs, and for the processing times to be recorded.


Rittal www.rittal.co.uk


Through maximum data quality and consistency in engineering, Rittal is creating the conditions for merging the real and physical workflows – with significant gains in efficiency for panel builders and switchgear manufacturers


QUICK DATA FLOW. EASY WORKFLOW.


ENCLOSURES ENCLOSURES P WER DO POWER DISTRIBUTIONISTRIBUTION CLIMATE CONTRCLIMATE CONTROL AT


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57