search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
| 65


Above left: The engineered or mass timber elements used for a New Model Building are glulam and LVL beams and columns, and CLT walls and floor slabs


Above right: The New Model Building uses a typical six-storey residential block to demonstrate how its principles and details can be applied


carbon structural material – at a time when the need to reduce carbon emissions and mitigate temperature rises has never been more urgent,” stated WTA. This loss of construction industry confidence, however, is not just being accepted. In fact WTA, working together with engineers Buro Happold, Gardiner & Theobald cost consultants and fire engineering specialists at UCL have just come up with a specific response. With backing from Built by Nature, an international network supporting initiatives to decarbonise the built environment, they have drawn up the New Model Building – a “set of design principles that showcase an exemplar methodology for building residential developments in a climate emergency”.


“Complying with current and consulted UK statutory guidance, the New Model Building utilises a low carbon engineered timber structure coupled with a non-combustible façade, demonstrating a way of building that responds to the challenge of meeting net zero carbon,” says WTA. “[It demonstrates] that timber can be used to construct housing that complies with statutory regulations and [aims] to change the current market perception of timber.”


The New Model Building uses a typical six- storey residential block to demonstrate how its principles and details can be applied. But it is stressed that they are not prescriptive and can be applied to deliver projects of varying forms and sizes and to produce bespoke designs for each site.


The engineered or mass timber elements used for a New Model Building are glulam and LVL beams and columns, and CLT walls and floor slabs. These can be used in a variety of ways and in combination with other traditional construction elements to deliver buildings that meet site requirements. At the same time, the New Model Building methodology has parameters. It has been developed for buildings under 18m high, with a floor-to-floor maximum of 2925mm, REI60 fire compartmentation and automatic fire sprinklers. Upfront embodied carbon (excluding sequestration) is 326kgCO2 m2


e/ (A1-5), and embodied carbon (A-C) is 271kgCO2


e/me, the RIBA 2030 Built Target. Buildings must also comply with all Building Regulation Approved Documents and not use combustible materials in external walls, allowing the building to achieve an EWS1 (external wall system) Form and meet GLA funding requirements.


The timber roof structure is installed to minimum 1:40 falls, with BROOF (t4) fire penetration resistant certified roof build up. The engineered timber structure is fully encapsulated using gypsum board applied in accordance with K-class test certifications and the façade is a non-combustible external wall system designed in accordance with Part B Regulation 7. Penetrations through the structure are protected using compliant details, balconies are of non-combustible steel structure in accordance with MHCLG and best practice methods of waterproofing are used.


The primary driver of the New Model Building, says WTA, is reduced carbon impact. Using an archetype residential building of six storeys and 29 flats, it completed a whole life carbon assessment (A-C), incorporating material volumes from the BIM Model and manufacturer Environmental Product Declarations and compared this to an equivalent building in concrete and steel frame. The carbon saving was 75%, plus the building achieved an A+ LETI rating (London Energy Transformation Initiative).


Other benefits of the New Model Building project is that it also comprises a set of details for key junctions. These are fully compliant with Building Regulations and, says WTA, will facilitate production of the technical design. “They have been developed in liaison with a national warranty provider to expedite the technical approval process,” it said. Comparing the archetype New Model Building with an equivalent reinforced concrete frame building using data from Q1 2023, it was 5% more expensive. But this figure does not take into account prelim cost benefits or cost savings through having a reduced build programme – and mass timber frames typically take a third of the time to erect of a concrete frame. Moreover, says WTA, building in timber is quieter and a mass timber prefabricated primary frame requires 60% fewer deliveries to site than a steel and concrete frame, “easing delivery times and construction planning”. ■


www.ttjonline.com | July/August 2023 | TTJ


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109