TRACKING HOUSEBUILDERS’ STRATEGIES FOR COMPLIANCE WITH THE FUTURE HOMES STANDARD INDUSTRY VIEWFINDER 49
Which, if any, measures have you introduced to improve comfort and reduce overheating risk?
constraints’ (23%), but also a ‘lack of clear guidance’ on the routes to delivery and compliance (23%). Perceived as somewhat less important was the previously reported shortage of installers, such as for heat pumps, and the supply of heat pumps themseles. ossily showing the diffi culties posed y the more commonly selected risks, continued concerns around the performance gap between as-designed and as-built building performance was only seen as an issue by 11%, and so was ‘warranty or insurance concerns.’ While good news, these two areas should not be discounted as ongoing problems for the sector, as buildings need to continue to evolve and scrutiny of as-built performance tightens. he low fi gure on the performance gap posing a ris for compliance was slightly counterintuitive, particularly given that 71% of respondents said they were concerned about this issue. Factors cited as reasons for the gap were topped by ‘installer skills shortages’ (69%), ‘poor installation quality’ , and importantly for heat pumps effi ciency, inadeuate commissioning.” Issues such as airtightness failures, occupant behaviour, product substitution (in value engineering processes), and a lack of post-occupancy evaluation, were seen as less prevalent. One verbatim comment nailed the crucial issue of a gap being caused (literally) by airtightness layers eing damaged y follow-on trades. here was a reasonaly strong ote of confi dence in the supply chain’s readiness to deliver on the FHS, as far as its provisions are known. Most respondents (67%) believed suppliers had made preparations to deliver compliance (although 36% of these said that the supply chain was only ‘partially prepared.’) And there was a contingent saying that suppliers were ‘poorly prepared’ (25%), and ‘not prepared at all (8%). If this is representative of the wider sector then clearly the jury is out, and the supply chain needs to do a lot more to convince many of its customers on its ‘FHS-readiness.’
CONCLUSION
Although the FHS is still not yet in force, our survey gives an interesting sample of housebuilders’ views and their approaches on how its requirements, as far as we know them, are being tackled in the sector currently. In some ways presenting a major shift to higher amounts of renewables, alongside more robust fabric and more rigorous design, for more progressive green advocates, the FHS still doesn’t offer a high enough bar for many enlightened developers. But, as housebuilders and developers move from consultation and planning toward practical implementation, this research gives a glimpse of the industry’s response, and remaining challenges.
SURVEY SPONSORS
We are grateful to our two survey sponsors for their participation in this White Paper report:
Envirovent Soprema
PRODUCED IN ASSOCIATION WITH
WWW.HBDONLINE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84