45
TRACKING HOUSEBUILDERS’ STRATEGIES FOR FUTURE HOMES STANDARD COMPLIANCE
What impact, if any, has the Future Homes Standard had on your build costs (using a three-bedroom home as an example)? INTRODUCTION
The Future Homes Standard (FHS) is due to come into force on 24 March 2027, albeit with a 12-month transition period for the industry to adjust. The change, alongside the expected simultaneous launch of the required Home Energy Model software, and revisions to Part L and Part F, marks a major shift
in how new homes across the UK will be designed and built, but also how they will be powered and heated.
Housebuilders face a series of key challenges on compliance, to be followed by EPC reforms in later 2027. These include higher uild costs forcing more pressure on already slim profi t
PRODUCED IN ASSOCIATION WITH
WWW.HBDONLINE.CO.UK
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84