search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
46 TRACKING HOUSEBUILDERS’ STRATEGIES FOR COMPLIANCE WITH THE FUTURE HOMES STANDARD INDUSTRY VIEWFINDER


margins  resulting from upgrades to uilding faric, including insulation and glaing, low-caron heating such as heat pumps, as well entilation and renewale electricity systems including solar  all increasing upfront construction costs. he oernments own impact assessment on the uture omes and uildings Standard, to gie it its full title, estimates signifi cant additional costs to usiness, which for houseuilders must either e asored or recoered from customers, in a price-sensitie maret.


he end product will e homes that emit at least  fewer caron emissions than homes uilt to  standards, ut eactly how this will e calirated and achieed will not e clear until the ome nergy odel fi nally emerges. he ey challenges for houseuilders include proiding heat pumps at scale as the central means of moing away from gas oilers. n addition, the reuirements of the S means certain changes to house design, to achiee greater air tightness, heating specifi cations, hot-water systems and installation processes.


he industry still faces shortages in trained designers of new low caron  systems, as well as installers and commissioning sills, with the latter in particular causing issues for in-use performance in some cases. ther riss for olume houseuilders include achieing consistent uality, lead times, technical support and pricing, across thousands of plots. n addition, electricity infrastructure and grid connections to support the shift to decaronisation, meaning electricity-ased deelopments, means much greater demand on the electricity grid. eelopers may need to prioritise earlier engagement with istriution etwor perators and, on larger sites, additional sustationnetwor capacity. Solar generation, eport capacity and electricity demand management also need to e considered.


he S reuires a rethin on pre-eisting house designs the changes and upgrades reuired cannot simply e olted on to eisting house types. eat pumps and associated infrastructure such as hot-water cylinders need design though applied, as do the ramifi cations of roof-mounted , insulation thicness, and thermal ridging. lso, entilation and, increasingly, oerheating reuirements can all affect fl oorplans, roof design, eleations, plot layouts, and saleale area. ore airtight, energy-effi cient homes can create oerheating issues, and indoor-air-uality riss, and entilation and shading need to e designed in a holistic, site-specifi c way to counter this. ompliance with the new art  standard goerning oerheating adds another design and coordination challenge, and some confl icts with art , particularly affecting apartments and higher-density deelopments. onstruction uality must e increased to achiee the designed uilding performance, ut also to address the performance gap that has een eperienced due to onsite compromises and challenges. irtightness, insulation continuity, thermal unctions, entilation commissioning and heat-pump siing all reuire tighter site uality control and higher sucontractor competence than may e common in preious schemes.  sustantial  of our respondents said they were ery or moderately concerned aout the performance gap currently in houseuilding. here are particular challenges where planning permissions, infrastructure agreements or house-type approals are


already in place. otential changes to eisting pre-consented schemes are liely to e reuired post-arch , or where construction doesnt egin efore arch , to mae them comply with tightened reuirements under the S. hese changes will liely increase air-tightness, new site infrastructure such as , or redesigns to include heat pump systems. hey may also mean acoustics upgrades, new sustations for increased electricity demand, or other increased plant space.


SME-SPECIFIC CHALLENGES


he S places further strain on already cash-strapped S houseuilders, attling a wea homeuying maret. arger olume uilders can spread design, training and procurement costs across thousands of plots. ne of the ey fi ndings of our surey of houseuilders was that uild cost infl ation was the iggest ris perceied y respondents around compliance, with nearly half picing this factor, although most said it would only add less than , to the cost of each house.


his shows how Ss are facing proportionately greater challenges in accessing technical epertise, training, procurement leerage and specialist consultants will e particularly confronted y such cost issues. he oernment has eplicitly considered the potential impact on Ss and resultant housing supply. he one-year transition period is welcomed, ut needs to e carefully managed y houseuilders. ssentially, they face a strategic uestion oer whether to ring forward sitesdesigns under eisting standards, or redesign pre-emptiely for the S. ur surey of houseuilders uilds on preious sureys we hae undertaen on the changes to arts ,  and the new art , and the emergence of the S itself. cnowledging the challenge for houseuilders has now eoled from understanding the Standards proisions, we canassed them on their uild strategies now the standard is here. he results help us gain a picture of how the sector is looing to delier effi cient compliance at scale without eroding margins, disrupting programmes, or eing derailed y sills and supply chain issues, grid capacity, or customer issues. s houseuilders and deelopers moe from consultation and planning toward practical implementation, our research eamined how the industry is preparing for the legally mandated deliery challenges which fi rms must address to produce energy-effi cient, net ero-ready homes. he study eplored how deelopers are adapting faric


specifi cations, heating strategies, entilation systems, glaing, renewale technologies and construction methods to meet the new reuirements. t also inestigated the ey commercial and operational pressures facing proects, including uild cost


PRODUCED IN ASSOCIATION WITH


WWW.HBDONLINE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84