HVAC
works on display was a fundamental concern. Their key requirement was for a long-term solution to improved efficiency and reliability through clever design. Added to this was the need to ensure the close-controlled conditions required by government indemnified standards.
The challenge for consulting engineer Arup, and principal contractor CBRE, who appointed Remeha, was to reconcile achieving the stringent environmental standards with the need to reduce energy use for more sustainable operation. Key to this was the refurbishment of the heating plant supplying Burlington House. This building, home to the RA since 1867, had previously relied on six large-output ageing boilers located in the original basement plant room for its heating.
Vasilis Maroulas, Associate at Arup, described the thinking and the wider benefits of the project for the RA: “The new boiler plantroom consolidates the heating generation across the RA Estate, centralising the maintenance regimes, liberating space for use as back-of-house storage and RA staff offices, and enabling the implementation of the critical electrical infrastructure upgrades.”
To meet the building’s flexible heat demand requirements, Arup specified that the boiler replacement should be achieved using 16 Remeha Quinta Pro 115 boilers. The boilers can provide a total heat output of up to 1.8MW to meet peak demand with the ability to be turned automatically down as low as 17kW when required for more efficient energy use. The design called for a large DN200 diameter primary boiler loop pipe to connect to the existing distribution system.
To accommodate the plant room constraints, the boilers were arranged in an in-line format. Arup and CBRE specified designing the rig in four separate modules to enable and facilitate positioning within the roof plant room. Each module comprised four Quinta Pro 115 units, shunt pumps, isolation valves, control valves and safety valves plus flow and return header pipework.
The individual modules, all featuring lifting eyes for easier manoeuvrability, were crane lifted through the limited opening in the roof structure into the plant room. As required, packaging was designed to be retained during the lifting process to suit CBRE’s plantroom build programme and assist in keeping the galleries fully operational during construction.
“CREATING THE BEST ENVIRONMENT EXPERIENCE AND
Each module also incorporated Remeha iSense Pro controls, pre-wired within control panels with the requisite safety interlocks and shut-off switches as specified by Arup. The control’s wiring was bespoke to this project to accommodate the specific requirements for additional pump control, monitoring and water treatment functions. To meet Arup’s specific requirement, the control panels were provided with interconnection boxes to add flexibility for future repositioning if required.
PRESERVING THE ART WORKS ON DISPLAY
WAS A FUNDAMENTAL CONCERN.”
The RA’s new plant room is situated above the Sackler Wing of Galleries, on the roof of Burlington House. A light, compact space with floor-to-ceiling glazing at either end, its long, narrow dimensions presented an interesting additional challenge for CBRE.
Senior Mechanical Engineer Antaeus Wheatley at Arup explained the decision to specify the Remeha Quinta Pro boilers: “Given the shape of the Sackler plant room, really the only viable solution was to use modular wall-mounted boilers. The Quinta Pro boilers were selected due to Remeha’s reputation for quality and reliability across their products and service.”
Working with Arup and CBRE, Remeha provided a bespoke, off-site fabricated rig solution that would meet the specific requirements of the project and site. Fully documented and factory tested, the rig has provided a high-quality solution to achieving maximum turndown ratio and more sustainable operation. The single delivery of boiler plant and increased ease of installation offered by the rig greatly reduced site time at the RA, minimising disruption to the building users.
www.tomorrowsfm.com
The rig itself was specially designed by Remeha in conjunction with Arup to accommodate the specified additional orifice plates, test points, expansion vessels and increased shunt pump sizes for each boiler on the frame.
The project was a collaborative effort with Remeha working closely with Arup and CBRE to ensure a smooth, efficient installation,
providing the mechanical and control functionality required by all parties.
The bespoke rig meets all consultant, contractor and building user requirements. The multiple-boiler, weather-compensating system maximises condensing operation and efficiencies. The space heating and hot water provision is more reliable, more secure and highly efficient due to the increased modulation. The boilers interface with the existing heating system, providing a flexible system that meets current demand while future- proofed for all future needs.
Aesthetically, the compact arrangement matches the dimensions of the room while ensuring adequate space for the additional Remeha boilers serving the Burlington Gardens site. The result is a design that meets the stringent environmental standards required by the galleries at the RA, achieving constant volume and consistent temperatures to protect and conserve the priceless works of art on display.
www.remeha.co.uk TOMORROW’S FM | 39
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80