built using a hybrid structure combining steel and wood. Kerto®


Kerto LVL elements for fast construction L


ocated within the established historic campus of Cranleigh School in Surrey, UK, the new van Hasselt Centre was


LVL (laminated veneer


lumber) was used in floor and roof elements to stabilise the steel frame. Use of light and green Kerto LVL products enabled fast installation on the construction site. Cranleigh has its roots in a community


school launched in 1865. As part of the school’s ongoing Masterplan development project, two disused squash court buildings were redeveloped and expanded. A new building of 2,525 square metres


covering the area was constructed around a steel frame with stabilising Kerto LVL wood elements for the floor and roof. Architects Allies & Morrison were given the task of designing the building.


Fast Light Green Kerto LVL The design team convinced the school of the feasibility of the steel-timber concept and Kerto LVL Ripa elements. All the coordination and decision making thus took place at the design stage rather than on the construction site. This sped up the work onsite. “Timber is used extensively in this project


and is inherent in its design concept. The structural timber is exposed to view throughout, providing maintenance-free soffits that give character and warmth to the building’s spaces,” says Jack Stephenson from the architects Allies & Morrison. “The RIPA technology allows the ribs and deck to be designed as one module, which increases the span by approximately 40 per cent. The prefabricated timber panels were chosen not only for visual reasons but also for their fast installation and lightness.” The project was coordinated using BIM


(building information modelling) Revit and IFC files. This improved the coordination between the architect, engineer, steel manufacturer, element manufacturer and construction site, minimising mistakes and problems onsite.


Enhanced loadbearing properties The van Hasselt Centre’s structure consists of a steel frame superstructure, with Kerto LVL elements creating the floor and roof. The Kerto LVL Ripa roof and floor


elements used in the Cranleigh School project were manufactured by Belgian company Dupac. The Kerto LVL Ripa elements design


technology is an innovation by Metsä Wood that allows wide spans without supporting partition walls or pillars. It is based on Metsä Wood’s Kerto LVL wooden panels, which feature outstanding dimensional stability. Based on Kerto LVL S-beam and Kerto LVL Q-panel loadbearing components and structural gluing, it enables very long spans for elements of up to 20 metres. Floor panels were constructed using 37


mm thick Kerto LVL Q-panels as deck and 73 x 358 mm Kerto LVL S-beams as ribs. The roof panels were constructed with 25 mm Q-panels and 45×300 mm S-beams. The acoustician required a concrete screed


on top of the timber panels. Kerto LVL Ripa was the only structure capable of easy load transfer within the maximum depth. The elements were chosen because they enabled long-span, lightweight, shallow depth and high capacity.


Compensating for frame tolerances The Kerto LVL elements give stability to the steel frame. As the steelwork had rough tolerances, elements and details were designed to allow for bigger steel tolerances. To allow varying levels of steel while still retaining the same floor level, a top-hung connection with bearing ribs on the steel was used. The top-hung detail was specially designed for the project, with glued elements and screw reinforcement. Using Kerto LVL in the roof elements allowed big openings, bringing light to the rooms.


Easy connections, speedy installation The Kerto LVL elements were screwed to the pre-drilled steel structure and to each other.


Because most of the details were left exposed, it was essential that connectors were partly hidden or completely invisible. This was achieved through careful design, cooperation with the architect and the use of tailored detailing. All services in the wooden elements


were pre-drilled to limit work onsite and minimise damage.


Up to 60 minutes of fire resistance The Kerto LVL floor elements were designed to withstand 30 minutes of fire, with an additional 30 minutes achieved through the application of a fire retardant coating, bringing the fire resistance class to R60. The timber elements of the roof structure


in the corridor areas had factory flame protection, with additional flame treatment applied on site.


Prefabrication saves time on the construction site The elements were entirely prefabricated, a decision that allowed work to be done simultaneously onsite and offsite, thereby accelerating the installation phase. Careful logistics planning – down to the order in which the elements were loaded on trucks to speed up installation – ensured just- on-time deliveries, minimising the need to store material onsite while enabling uninterrupted installation. The properties of the Kerto LVL elements as reinforcements in a steel frame structure, combined with fast and easy installation, allow fast completion of even demanding structures.


www.metsawood.com


ADF SEPTEMBER 2019


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108