CABLE INSTALLATION TRENCHLESS CABLE ROUTES Onshore cable installation routes regularly require the use of trenchless methods


A E Yates Trenchless Solutions, which own and operate a large fleet of specialist equipment offering a range of techniques, were engaged on the largest onshore windfarm in England at Keadby in North Lincolnshire for three crossings of a large watercourse to allow a number of cables to be installed.


PROJECT EXPANSION


The company were initially appointed to carry out the Horizontal Directional Drilling works but, as the works were installed ahead of the cabling works in a remote area of the project, the works package increased to include temporary access roads to the two drilling sites and provision of welfare facilities. The three 120m long drills, one at one location and two at the other, were carried out using a 25 tonne pulling force drilling rig. The sizing of the rig was determined by the diameter of the duct to be installed and the ground conditions that the duct was to be pulled through. The drill depth was around 9m to allow a minimum of 3.5m cover to the bed of the drain to comply with British Waterways Code of Practice.


PROJECT SPECIFICATION


The duct sizes were 355mm, 560mm and 630mm but each was initially drilled to 350mm and then increased by incremental reaming. The bore was supported in the temporary state by injecting biodegradable drilling fluid and the duct, supplied in 12m lengths and


butt fusion welded on site, was fitted with a towing head and pulled through towards the rig. A total of 10 sleeves were then pulled through inside the installed ducts in bundled ‘trefoil’ formation. The project was managed and delivered safely on budget and significantly ahead of schedule.


INDUSTRY TRACK RECORD


In addition to trenchless works another company in the A E Yates Group, A E Yates Limited, also have a track record


in the wind sector having carried out Balance of Plant works to fifteen onshore windfarms across the UK. This impressive record includes the decommissioning of 22 turbines and repowering with nine at the Ovenden windfarm in West Yorkshire.


A E Yates Trenchless Solutions SCAN/CLICK


MORE INFO


www.windenergynetwork.co.uk


75


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76