CASE STUDIES
Mitsubishi Electric delivers the sweet smell of success to Lush
Ethical cosmetics retailer Lush is now able to deliver energy efficient air conditioning to employees at its new office space in Poole thanks to the installation of Mitsubishi Electric’s City Multi VRF heat recovery system.
L
ush expanded its business with a new unit at Dolphin Quays, a complex made up of both residential apartments and office
spaces. The units came equipped with running water and electricity, but Lush needed comforts for employees, including air conditioning, to be installed. The solution came in the form of 12 ceiling-
suspended City Multi VRF indoor units and one floor-positioned unit, installed by Modern Facilities Services, a Mitsubishi Electric Accredited Installer.
The system is able to move excess heat, generated from an area which is being cooled, to other parts of the building which need heating, helping to deliver the high levels of efficiency that Lush required. The City Multi system also
46 February 2020
offers outstanding energy saving performance, advanced control system and flexibility of design for specifiers and installers. The long pipe-runs and ability to connect up to 50 indoor units to one outdoor condenser means that it offers advanced, controllable energy efficient comfort to suit almost any building. Krystal James, Project Coordinator at Lush,
said: “We wanted a system that would create a pleasant working environment for our staff, while fitting comfortably into the office environment. We also wanted to make sure we avoided any draughts for our employees.” Two Lossnay Mechanical Ventilation with Heat Recovery (MVHR) units were also installed at the site in order to remove stale air from the office. The units operate by capturing up to 80% of the
temperature of the outgoing air, meaning less energy is needed to bring fresh outdoor air up to the indoor temperature. There were a number of challenges during
the installation which Mitsubishi Electric and Modern Facilities Services were able to overcome, including the need to create additional frameworks for the units to sit on, and working with a large amount of existing pipework at the site. Gary Whitcher, director at Modern Facilities Services, said: “With a tight eight-week time scale to work towards, the team had to work hard and fast to ensure everything was delivered when promised. We are proud of the result and are pleased to hear that Lush Ltd is considering rolling out the same system to its other sites.”
www.acr-news.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76