Ù
Ù
Ù
Ù Ù
Ù
Ù
Ù ÙÙ ÙÙ
Ù ÙÙ
Ù
ÙÙ
Ù
Ù
ÙÙ ÙÙ
Ù
Ù
Ù
632500
633000
633500 ÙÙ Ù
634000 Ù ÙÙ
634500
635000
635500
636000
636500 F
B1083
East Lane
Notes: 1. Improvements to be determined following additional engineering design in consultation with the Highways Authority through the final Traffic Management Plan
For overview figure, please refer to figure 1.0 Data derived from Suffolk County Council,
Department for Transport and RSK Surveys School Lane
Datum: OSGB36 Projection: OSNG
Secondary CCS (Site I) Legend
Potential Temporary Road Works Horizontal Directional Drill (HDD) section Construction Consolidation Sites Access Works (Upgrade of Existing Track) Access Works (Temporary Access) Order Limits Local Access Route Suffolk Lorry Route Network
ÙÙÙÙ Advance Warning Signs Localised Road Improvements
to be contained within the existing highway boundary1
© ESRI 632500 633000 633500 G 15/10/13 JG Order Limits, works areas and title updated
E 24/04/13 JG Updates F 29/04/13 JG Updates to display, layout and legend
Rev Date By Comment Ref: \\hh-nas3\p-projects\EIA\40000-Helsby Projects\P41388 - East Anglia ONE\07 GIS\
LocalAccessRoads09RevG.mxd 634000
Original A3 Plot Scale
1:12,500
© Crown copyright, All rights reserved. 2013 Licence number 0100031673. © East Anglia Offshore Wind Limited 2013
634500 0
0.25
635000 0.5 km
635500 636000 Outline Traffic Management Plan
Potential Temporary Road Works - The Street and Ferry Road, Alderton to Landfall
Date Rev
636500 Drg No 371024-TRNS-002-09
15/10/13 G
Layout N/A
Appendix 1
Figure 1.01
Ù
Ù Ù
ÙÙ
Ù
Ù
ÙÙÙÙÙ
ÙÙÙ
Ù ÙÙ
Ù Ù Ù
Ù
Ù
Ù
Ù
Ù
Ù
Ù
ÙÙÙ
Ù
ÙÙ
Ù
Ù
Ù
Ù
Ù
Ù
Ù
ÙÙ
239000
239500
240000
240500
241000
241500
ÙÙ
239000
239500
240000
240500
241000
241500
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32