Road widening and access provisions at CCS and HDD site access locations Lay-bys for passing places along sections of narrow road width Modification or improvements to existing road junctions Pedestrian provisions and footways Road markings Carriageway strengthening Visibility improvements within highway verges.


40 All local access routes that would be used for the passage of works vehicles would be inspected in collaboration with the Highway Authority and all localised highway improvements identified and agreed with the Highway Authority. The Highway Authority prior to works vehicles using the road so affected would approve all highway works so agreed.


1.9 Route Assessment Surveys 41


The information presented as part of this Outline TMP would be updated by the Principle Contractor. This update would then be submitted to and agreed with the Highways Authority.


Outline Traffic Management Plan – Version 3


Page 19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32