Potential Temporary Traffic Management and Improvement Measures
Assess Type
Local Access Road
Assessed Road Top Street and The Street,
School Lane, Sandy Lane and Waldringfield Road between the A12 primary CCS and the Martlesham Creek HDD site
Figure No. Potential Road Works
Figures 1.06 Road widening at Top Street / CSS site access
Alterations to CCS site frontage along Top Street to accommodate CCS access from Top Street
Modifications to Brock Lane access off The street to accommodate HDD access
Localised verge clearance to facilitate visibility at CCS
Waldringfield Road / Newbourne Road Junction improvements
Access improvements at existing Thatched Farm access track.
Advance warning signs
Pedestrian safety measures and advanced warning signs at Sandy Lane. No HGV access to Sandy Lane from the south.
Local Access Road
Seckford Hall Road between A12 and Lodge Road
Lodge Road between B1079 Grundisburgh Road and HDD site access
Figure 1.07
Localised road widening / overrun areas
Passing places along narrow roads
Pedestrian safety measures Advance warning signs
Outline Traffic Management Plan – Version 3
Page 15
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32