Consultee


Date /Document


Comment


associated with EMF around the overhead power lines, above-ground connection cables, and underground cables and analyse these impacts.


SCC


June 2011 / Scoping


The route of the onshore cabling is crossed by numerous PRoW; many are important for sub-regional and local recreational and tourist purposes and form important local transport links of local significance.


The Council will check plans to ensure all relevant PRoW information is captured.


All PRoW would need to be restored.


Works may require highway closures and possibly alternative routes, depending on local importance.


Parishes and councillors need to be informed of the proposals and works programme. Mitigation proposals may be sought to overcome any issues identified.


Response / where addressed in the East Anglia THREE PEIR


onshore cable and the operation of the converter station is addressed in section 22.6.3.


PRoW are shown on Appendix 22.2, Figure 22.6 and are discussed throughout this chapter, including discussion of temporary closures and diversions. EATL note the requirement to keep parishes and Councillors informed of proposals and works programmes.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Appendix 22.2 East Anglia ONE Land Use


consultation and Sita Statement of Common Ground


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35