Consultee HPA


Date /Document


February 2012 / PEIR


Comment


No further comments to those provided at scoping. Attached a framework for considering health impacts including EMF.


Bawdsey Parish Council


February 2012 / PEIR


(a) What research/evidence is there for dispersal of EMF along and above the buried cable trench?


(b) What are the suggested or proven health implications of this?


(c) What are the health risks if cable(s) fracture?


Martlesham Parish Council


February 2012 / PEIR


Provided a circular walks leaflet showing all footpaths in that area of Martlesham. Hoped that footpaths will only be closed for a minimum period during construction given their use.


Waldringfield Parish Council


February 2012 / PEIR


Support all necessary cable tunnelling and trunking for this and possible future wind farms to be done in one go.


Tunnelling should be carried out under hedgerows where possible to avoid disturbance. Needs to be adequate compensation for farmers.


Planning Inspectorate


June 2011 / Scoping


Cross reference should be made to the possible impacts on agriculture and soils in relation to any potential contaminated land and run-off. The potential for sterilisation of land should be considered.


Issues associated with agriculture and soils in relation to any potential contaminated land and run- off are addressed in Chapter 19 Geology and Ground Conditions.


The potential to sterilise the land through permanent easement restrictions is addressed in section 22.6.3


Planning Inspectorate


Preliminary Environmental Information May 2014


June 2011 / Scoping


The ES should acknowledge potential health issues


East Anglia THREE Offshore Windfarm


Consideration of EMF arising from the installation of the


Appendix 22.2 East Anglia ONE Land Use


consultation and Sita Statement of Common Ground


PRoW (including those that make up the Martlesham circular walk) are shown on Appendix 22.2, Figure 22.6 a-? and are discussed in section 22.6.2


Impacts to agriculture are discussed in section 22.6.2.


Response / where addressed in the East Anglia THREE PEIR


Consideration of EMF arising from the installation of the onshore cable route and the operation of the converter station is addressed in section 22.6.3.


Consideration of EMF arising from the installation of the onshore cable route and the operation of the converter station is addressed in section 22.6.3


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35