23.1 East Anglia ONE Onshore Ecology Consultation Table 1: East Anglia ONE onshore ecology consultation (taken verbatim from consultation documents)
Consultee
East Anglia ONE Sita UK
Date /Document
Statement of Common Ground (SoCG) / July 20131 (Appendix 22.1)
East Suffolk Internal Drainage Board
Comment
Response / where addressed in the East Anglia THREE PEIR
The SoCG with Sita is provided below in Appendix 22.1
Works would comply with SoCG, as amended.
‘Local soils are known to be quite unstable; therefore significant works may be required for several years following cable installation to ensure watercourse bank stability.
Highlighted the frequency of marsh flooding and how marshes have shrunk over the years, including leaving one or two bridges ‘high and dry’. Suggested consideration of the possible need to relay cables in the future to address land shrinkage problems that may arise.’
Detailed crossing methodologies would be prepared prior to construction and would take account of works necessary to ensure bank stability.
Detailed project design including cable burial depths and routeing of trenches within the working width would take account of land shrinkage risks. Details will be provided in the Construction Code of Practice (CoCP).
Storage and handling of soils during construction, and reinstatement following construction would be completed following strict guidelines to protect soil qualities.
See also Chapter 21 Water Resource and Flood Risk.
Interoute
June 2012 / Phase 2 Consultation
‘Route will cross our London to Leiston fibre optic duct and cable route which runs the
EATL can confirm that the A12 and verge would be crossed
1 A SoCG was produced and signed to show clearly areas of agreement and disagreement between EAOL and SITA UK, in relation to the proposed project. Sita is the promoter of a Greenhouse development on land within the proposed order limits of East Anglia ONE. The SoCG seeks to ensure that the developments promoted by Sita and East Anglia ONE Limited (EAOL) can both be accommodated within the land required. The document has been signed by both parties.
Preliminary Environmental Information May 2014 East Anglia THREE Offshore Windfarm Appendix 22.2 East Anglia ONE Land Use
consultation and Sita Statement of Common Ground
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35