Martlesham Parish Council
June 2012 / Phase 2 Consultation Comments
Comment
verge of the A12. Assume this section will be directionally drilled, and not open cut.’
‘Hoped that local footpaths will only be closed for a very minimum period during construction, given their use.
Will be temporary closures of some footpaths where the route crosses.
Suffolk County Council has confirmed they will give a 6 months closure window to enable a more flexible 2 week closure. Seek written reassurance that a short closure will not be extended for months.’
Mid Suffolk
District Council (MSDC)
June 2012 / Phase 2 Consultation Comments
‘Consider the extinguishment of bridleway Bramford BR1 has not been demonstrated as necessary; would prefer the bridleway be retained or diverted.
Reiterates comments offered in PEIR response, and seeks assurance that land sterilisation issues have been appropriately assessed.’
Playford Parish Council
June 2012 / Phase 2 Consultation Comments
‘Pig Lane bridleway is a much used bridleway by horses and riders; horses may well become frightened by heavy machinery putting themselves in danger.’
Response / where addressed in the East Anglia THREE PEIR
using HDD techniques.
EATL would only be seeking temporary closures and local diversions during cable installation works. To maintain construction schedule flexibility the closure notice would cover a six month period, however actual closures are only anticipated to take approximately two weeks per location.
BR1 would be retained and not diverted in final onshore cable route selection.
Potential impacts on future land use are addressed in section 22.7.
All construction work would be constrained to a defined working width and as such any interaction between machinery and equestrian users would be kept to a minimum. Construction personnel would be asked to be mindful of any equestrians using local bridleways to minimise the chance of scaring the horses.
SCC
June 2012 / Phase 2 Consultation Comments
Preliminary Environmental Information May 2014
‘Expect priority [Public Rights of Way (PRoW)] to be kept open during works, or temporarily diverted to
East Anglia THREE Offshore Windfarm
EATL would be seeking temporary closures and local diversions during cable installation works for all
Appendix 22.2 East Anglia ONE Land Use
consultation and Sita Statement of Common Ground
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35