This page contains a Flash digital edition of a book.
Sita : Version 4: July 2013


TABLE OF MATTERS AGREED AND NOT AGREED ID


Issue 004


Location of Site Access for EAOL construction and maintenance.


Sita


EAOL Agreed 005


Location of Site Access for Greenhouse construction and operation


006


Location of crossing of Pound Lane as shown on the plan for EAOL cable


TBC by Sita – currently subject to discussions with the Highway Authority


Site access for EAOL construction and maintenance activity shall use the same access points as provided by Sita for the operation of the greenhouses. Agreed


There are no implications for EAOL using a southern access not currently identified on any plans.


Agreed 007 Spoil – temporary and permanent storage


Earthworks will be required to create a development platform for the greenhouses


The location of the open-cut crossing of Pound Lane will be as shown on drawing nos. EAOL/SSL–20130410–01 and/or EAOL/SSL– 20130410–02 Agreed


EAOL have no restrictions on the earthworks required to create a development platform for greenhouse construction.


The cables will be installed below final site levels as determined by Sita. Prior to cable route construction the cable route corridor shall be sensibly level. No spoil or any other temporary or permanent storage of any material, building or structure shall be permitted above the installed cables and ducts.


5


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35