TABLE OF MATTERS AGREED AND NOT AGREED ID


Issue 009 Location of lagoons required by Sita


Sita


EAOL Agreed


Lagoons shall not be located over the EAOL cable route corridor and a 2.5m buffer. This is in order to ensure safe access for maintenance of the lagoon by Sita and routine inspection of cable route corridor by EAOL. The lagoon shall be designed to ensure the stability of the side slopes in both the full and fully drained condition to preclude any possibility of ground movement that could affect the integrity of the buried power cables. The lagoon shall be lined or otherwise made impermeable to prevent water ingress into the cable trenches.


010 Crossing of EAOL cable and ducts with service pipes including those relating to drainage into lagoons


Crossing point to be confirmed at a later date but locations will be agreed providing the methodology is agreed with EAOL. At this stage EAOL overwhelming preference is for service crossings to be by bridge or other overhead system with supports located as far as practicable outside of the cable route corridor.


011


EAOL cables and ducts where installed in conjunction with an existing access.


EAOLmethod of working (including timing) to be agreed with Sita such that construction activities are least disruptive to the effective operation of the greenhouse


7


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35