Area
Footpath to be temporarily stopped up
Plan Ref
Definitive Map Ref
Mid Suffolk District 38 2069 Mid Suffolk District 39 3542 Mid Suffolk District 41 3136 Mid Suffolk District 42 3133 Parish
Grid coordinates at start of crossing
Path Number Easting Akenham Bridleway 5 614504.84 Claydon Bramford Bramford Footpath 21 613668.71 Footpath 10 611276.71 Footpath 8 610838.69 Northing 249086.25 249167.47 247828.58 247434.12
Grid coordinates at start of crossing Approximate Extent of temporary stopping up (m)
Easting 614537.79 613636.165 611265.877 610932.772 Northing 249012.879 249093.197 247701.159 247452.79
22.4 Table 22.4 Public Right of Way (PRoW) Crossings (for which no replacement would be provided Scenario 2) Area
Footpath to be temporarily stopped up
Plan Ref
Mid Suffolk District Council
Definitive Map Ref
43 3127 Parish Bramford
Grid coordinates at start of crossing
Path Number Easting Footpath 2 610402.43 Northing 246523.82 Easting Northing 80 80 130 95
Grid coordinates at start of crossing Approximate Extent of temporary stopping up (m)
610582.125 246209.592 384
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Appendix 22.2 Land Use Data Tables Page 9
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35