Sita : Version 4: July 2013 Application elements under consultee remit


This Statement relates to Work shown on drawings EAOL/SSL–20130410–01 and/or EAOL/SSL–20130410–02 (Work Number 36) as defined in Schedule A, Part 1 of the Draft Development Consent Order. TABLE OF MATTERS AGREED AND NOT AGREED ID


Issue


Matters Agreed 001


002 003


Location of the EAOL Cable Route is acceptable to both parties as identified on drawings nos. EAOL/SSL-20130410-01 and EAOL/SSL– 20130410-02


Location of Sita Greenhouses is acceptable to both parties as identified on drawing nos. EAOL/SSL-20130410-01 and EAOL/SSL– 20130410-02


Location of the EAOL trenchless crossing of the B1113 as identified on drawing EAOL/SSL- 20130410-01


Sita EAOL Agreed Agreed Agreed


The agreed location of the EAOL trenchless crossing of the B1113 is coincident with the access for the northern greenhouse as identified on drawing no. EAOL/SSL-20130410- 01. A minimum working width of 40m is required for the trenchless crossing and this should be maintained free from vegetation and any new buried or overhead services until completion of the crossing.


See Item 008 for soft landscaping restrictions post cable installation.


4


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35