TABLE OF MATTERS AGREED AND NOT AGREED ID


Issue


012 Relocation of existing services and installation of new services.


Sita


Existing overhead and potentially some underground services will be relocated to allow construction of greenhouses. New services will be required for the greenhouses and supporting infrastructure.


EAOL


There are no restrictions on overhead crossing of the cable route corridor. Any supporting structure (e.g. new power pole) to be located as far as is reasonably practicable outside of the cable route corridor.


Any new utilities and services associated with greenhouse construction to be located outside cable route corridor. Any future crossings (such as heat pipes) to be above ground.


013 Location of cable joints


EAOL may require up to three locations for jointing of cables which after reinstatement would have no further impact on greenhouse operations. The locations of joints to be confirmed but will be within the route corridor identified on drawing nos. EAOL/SSL– 20130410–01 and/or EAOL/SSL–20130410–02.


Matters Not Agreed 014


The commercial arrangements regarding land compensation are not agreed and are subject to separate discussion


Agree the commercial arrangements are not agreed and are subject to future discussion with the relevant parties.


8


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35