Comment


suitable alternative routes. Will advise where it considers lower priority routes can be temporarily closed. Expect PRoW to be restored to their original routes and to an acceptable condition post completion of the works.’


SCC


June 2012 / Phase 2 Consultation Comments


‘Require a pre-construction survey of the affected PRoW, including those to be used for access, to inform this reconstruction process. Inform Parish Councils and councillors of the proposals and work programme. County council will require details of the scheme communications strategy. PRoW temporary closures and diversions require legal orders; application to be made at least 3 months prior to allow for administration and statutory advertising time.’


Suffolk Coastal District Council (SCDC)


Health Protection Agency (HPA)


MSDC


June 2012 / Phase 2 Consultation Comments


June 2012 / Phase 2 Consultation Comments


June 2012 / Phase 2 Consultation Comments


MSDC


February 2012 / PEIR


‘Expressed support for keeping parish councils and councillors informed of the proposals and work programme.’


‘Aim to provide an assessment of the health impact of the electric and magnetic fields produced by the equipment.’


‘Reiterate the PEIR comments and request consideration to the impact of EMFs from high voltage cabling on local populations be assessed.’


Similar projects have provoked concerns and discussion regarding the impact of EMFs from high voltage cabling on local populations. Request topic be included in the ES.


Preliminary Environmental Information May 2014 East Anglia THREE Offshore Windfarm


Response / where addressed in the East Anglia THREE PEIR


PRoWs that are within the cable corridor. (See section 22.6.2) EATL would seek to reinstate PRoW after closure.


EATL can confirm that a pre- condition survey would be commissioned (see section 22.6.2). EATL would endeavour to keep Parish councils informed of the proposals and work programme. EATL would work with Suffolk County Council to ensure all temporary closures and diversions meet with their approval.


See comment above.


An assessment of the potential electromagnetic field (EMF) impacts associated with the project is provided in section 22.6.3


An assessment of the potential EMF impacts associated with the proposed project is addressed in section 22.6.3


Consideration of EMF arising from the installation of the onshore cable route and the operation of the converter station is addressed in section 22.6.3.


Appendix 22.2 East Anglia ONE Land Use


consultation and Sita Statement of Common Ground


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35