Sita : Version 4: July 2013
• Up to three offshore collector stations and up to two offshore converter stations. • Up to one offshore meteorological mast to collect information such as wind speeds and wind direction. • Cables buried in the seabed to link the wind turbines, the offshore stations and meteorological mast. • Up to four offshore undersea export cables to transmit electricity from the offshore stations to the shore. • A landfall site at Bawdsey with onshore subsurface transition pits to connect the offshore and onshore cables.
• Up to four onshore underground cables, with jointing pits, running for approximately 37 km from the landfall at Bawdsey to the connection point near Bramford, Suffolk, to transmit electricity to a new onshore converter station and up to eight additional underground cable ducts to accommodate the cables for future projects.
• An onshore converter station adjacent to existing National Grid substation near Bramford, Suffolk, to connect the offshore wind farm to the National Grid network.
• The permanent and/or temporary compulsory acquisition of land and/or rights for the Project. • Overriding easements and other rights over or affecting land for the Project. • The application and/or disapplication of legislation relevant to the Project including inter alia legislation relating to compulsory purchase. • Such ancillary, incidental and consequential provisions, permits or consents as are necessary and/or convenient.
The Application was submitted to the Planning Inspectorate on 21 November 2012 and accepted for examination on 14th December 2012.
3
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35