Consultee


Planning Inspectorate


Date / Document


East Anglia THREE Scoping Opinion December 2012


Comment


Appropriate cross-reference should be made between the geology chapter, the water resources and flood risk assessment and land use sections in the ES in relation to any potential contaminated land and run-off. In the light of the works proposed, cross reference should also be made to the section on marine water and sediment quality in order to address the potential impacts of sediment along the foreshore.


Water Management Alliance on behalf of East Suffolk Internal Drainage Board (IDB))


East Anglia THREE Scoping Opinion December 2012


When preparing their final environmental assessments, the applicant will need to ensure that they consider the potential effects of their works on all watercourses and drainage systems, not just the rivers that are mentioned in the “Water Resource and Flood Risk” section of each report.


Suffolk County Council (SCC)


East Anglia THREE Scoping Opinion December 2012


It is not clear whether any flood protection measures are needed for the proposed jointing pits (paragraph 139). This is particularly relevant to any on the north shore of the Deben. We would not wish to see prominent structures in the landscape thus flood protection must be designed accordingly.


Response / where addressed in the PEI


This has been addressed through references to the Chapter 23 Ecology, Chapter 19 Soils, Geology and Ground Conditions and Chapter 8 Marine Water and Sediment Quality chapters.


Noted. This chapter considers all water courses identified to date, and watercourses identified in further site visits will be considered in the final ES


Jointing pit infrastructure at the Deben will be designed to allow for flooding.


21.2.1 Statement of Common Ground 7.


In addition to the consultation undertaken and detailed above, a Statement of Common Ground (SoCG) was produced for East Anglia ONE in July 2013 for Water Resource and Flood Risk. Consultees included Suffolk County Council, Mid Suffolk District Council, Suffolk Coastal District Council, Environment Agency and East Suffolk Internal Drainage Board. The following sections outline the matters agreed in the


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 21 Water Resource and Flood Risk Page 4


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58