2012a) and Phase 2 Consultation (RSK 2012b), which are also considered relevant to East Anglia THREE given that the onshore cable route is shared with East Anglia ONE.
Table 21.1 Consultation Responses Consultee
Date / Document
East Anglia THREE
Planning Inspectorate
East Anglia THREE Scoping Opinion December 2012
The Planning Inspectorate welcomes the provision of a Flood Risk Assessment (FRA) and recommends on-going consultation with the EA and relevant local authorities. The FRA should form an appendix to the ES. Paragraph 660 of the Scoping Report identifies that there are existing flood defence walls at the Deben crossing; the potential impacts of the proposed development on flood defences should be considered within the FRA. The FRA should detail whether any flood protection measures are needed for the jointing pits
Planning Inspectorate
East Anglia THREE Scoping Opinion December 2012
The Applicant’s attention is drawn to the comments of East Suffolk Internal Drainage Board (see Appendix 2 of this Opinion) regarding the need to consider the potential effects of the proposed development on all watercourses and drainage systems, not just the rivers specifically identified in Section 3.1.4 of the Scoping Report.
Planning Inspectorate
East Anglia THREE Scoping Opinion December 2012
A methodology for ongoing water monitoring during the construction and operational phases of the development should be discussed as part of the EIA.
A flood risk assessment is to be updated for East Anglia THREE. This will be presented as an appendix to the final Environmental Statement (ES) and DCO Application once access is confirmed.
Comment
Response / where addressed in the PEI
All watercourse crossings will be addressed in the final Environmental Statement, following a site walkover which is required to determine precise numbers and locations of water crossings subject to changes in access requirements under Scenario 1.
All watercourse crossings will be covered in the FRA.
The requirement for groundwater and / or surface water quality and / or level and flow monitoring will be identified on the basis of the significance of any potential impacts to sensitive receptors. This will be identified as part of the ES.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 21 Water Resource and Flood Risk Page 2
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58