Chapter 21 Water Resource and Flood Risk figures are presented in Volume 2: Figures and listed in the table below.
Figure number 21.1 21.2 21.3 21.4 21.5
21.6 21.7
Title
Onshore Electrical Transmission Works and Study Area WFD Groundwater Quality
Groundwater Vulnerability, Abstractions and Discharges HDD Water Crossings associated with onshore cable route
Environment Agency Flood Zones for Planning (converter station and onshore cable route)
WFD Surface Water Quality Designated Sites
Chapter 21 Water Resource and Flood Risk appendices are presented in Volume 3: Appendices and listed in the table below.
Appendix number 21.1
21.2 21.3 21.4
Title
East Anglia ONE PEIR (RSK 2012a) and Phase 2 (RSK 2012b) Consultation
Converter Station Flood Risk Assessment (to be completed for final ES) Onshore Cable Route Flood Risk Screening(to be completed for final ES)
Water Framework Directive Compliance Assessment (to be completed for final ES)
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 21 Water Resource and Flood Risk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58