is not possible to say where or when failures of the infrastructure requiring maintenance will occur, however, it is likely that maintenance activities would be focused upon the junction pit locations (which would be sensitively located) and therefore the magnitude of any impact would be low and be highly localised. It is unlikely that failures would occur across multiple projects simultaneously and therefore it is considered that cumulative impacts during operation would not be above theminor adverse significance predicted in section 21.6.2.


21.7.3 Potential cumulative impacts during decommissioning 137. Under all scenarios at decommissioning cables buried directly into trenches would be left in-situ. Where cables are installed in ducts it may be possible to remove them, therefore, the worst case would be under Scenario 1, where all three projects are constructed. In this case there would be up to two sets of cables (i.e. those from the proposed East Anglia THREE and East Anglia FOUR projects) which could be removed. The potential impacts would then be similar to the potential impacts for construction of the cable route as outlined for Scenario 1 involving construction of temporary access, and excavation at 61 jointing pit locations (refer to section 21.6.1). The cumulative impact would be no greater than minor adverse.


138. For removal of the converter stations, impact for each would be minor adverse (see section 21.6.1). Given the absence of sensitive geological receptors at this location, cumulative impacts are not considered to be above this however decommissioning is likely phased to further reduce the significance of any potential impacts.


21.8 Inter-relationships


139. Parameters or “sources” that are considered to interact with receptors identified in this chapter are listed in Table 21.17 below.


Table 21.17 Inter-relationships with soils, geology and ground conditions Inter-relationship


Section where addressed


All Phases Marine Geology, Oceanography and Physical Processes


Water and Sediment Quality Ground Conditions Land Use Ecology


21.9 Summary


140. This section summarises the main findings from the impact assessment. This is outlined in Table 21.18.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 21 Water Resource and Flood Risk Page 48


21.5, 21.6, 21.7


21.5, 21.6, 21.7 21.5, 21.6, 21.7 21.5, 21.6, 21.7 21.5, 21.6, 21.7


7 8


19 22 23


Linked Chapter


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58