CAPITAL PROJECTS&CONTRACTSNEWS ROUND-UP more news at
www.heavyliftpfi.com OIL & GAS NEWS NEWS IN BRIEF Daelim wins Iran work
Daelimhas received a letter of award from Isfahan Oil Refining Company to carry out a USD2 billion redevelopment of Isfahan Refinery, located 400 km south of Tehran, Iran.
ENAP chooses Fluor Fluor has been awarded a contract by Empresa Nacional del Petróleo (ENAP) for the EPC work on a new process unit at its Biobío refinery in Chile.
Aramco platforms deal Saudi Aramco has signed a joint venture deal with Nabors Industries to build 50 onshore rigs over the next decade. Aramco signed a similar deal with Rowan Cos to construct 20 offshore rigs over ten years.
Wison in Kazakh first Wison Engineering has been awarded an EPC contract by Astana Trans Oil for a new LNG project – the first LNG facility in Kazakhstan.
Pertamina contract Pertamina has been selected by the Indonesian government to build and operate the 300,000 bpd oil refinery in Bontang, East Kalimanta.
Shell wind contract A consortium led by Royal Dutch Shell including Eneco, Van Oord and Mitsubishi/DGE was awarded the contract to build 700 MW of offshore wind capacity in the Netherlands.
Nigeria mega-deals Chongqing Construction Engineering Group, Tianjin Energy Resources, Oilserv and Alpha Group of Companies have signed agreements regarding several multi- billion dollar projects in Nigeria. They include oil and gas pipelines, refineries, ports and highways.
Wärtsilä hybrid deal Wärtsilä has been awarded the contract to supply a bio-hybrid production plant to German energy company Erdgas Südwest.
40
Majors sign deal on Caspian field
Operating Company (AIOC), have signed a letter of intent for the future development of the Azeri-Chirag-Gunashli field in the Azerbaijan sector of the Caspian Sea. Under the agreement, AIOC (BP, Chevron,
T
INPEX, Statoil, ExxonMobil, TPAO, ITOCHU and ONGC Videsh) will continue to develop the field until 2050.
platforms deal L&T Hydrocarbon Engineering, in consortium with EMAS Chiyoda Subsea, has won two engineering, procurement, construction and installation (EPCI) contracts from Saudi Aramco. The pair will supply and install four wellhead decks in the Safaniya field and upgrade 17 platforms off the coast of Saudi Arabia.
L&T awarded
Salalah LPG work Petrofac has signed a contract worth close to USD600 million with Salalah LPG SFZCO, a wholly owned subsidiary of Oman Oil Facilities Development Company, to undertake the EPC work on its Salalah LPG extraction project in the southern part of Oman.
Petrofac wins Venture Global to
invest USD8.5bn Venture Global plans to invest USD8.5 billion in the development of a gas liquefaction and LNG export
January/February 2017
terminal in Plaquemines Parish, Louisiana, USA. The 632 acre (255 ha) site is on the Mississippi river; Venture Global hopes to start construction in 2018 and have the facility fully operational by mid-2020. To deliver natural gas to the project site, Venture Global is proposing to build two 42 inches (1.07 m) diameter pipelines that connect to existing interstate pipelines.
Bahrain starts first LNG terminal
Bear Head clears
he State Oil Company of the Republic of Azerbaijan and BP, the operator acting on behalf of the Azerbaijan International
A BP rig on the ACG field, West Chirag.
‘green’ checks Bear Head LNG says its Bear Paw Pipeline has passed an environmental assessment from Nova Scotia Environment. The 38.8 mile (62.5 km) pipeline would supply natural gas to the proposed USD2.2 billion Bear Head liquefied natural gas export terminal in Richmond County on Cape Breton Island.
PLN chooses KBR
for gas network KBR has been awarded a contract by Indonesian state-owned power generation company PT PLN for engineering and design services to expand the gas supply infrastructure across Indonesia.
Technip team to
Bahrain LNG started construction work on the kingdom’s first LNG receiving and regasification terminal during January 2017, with completion scheduled for 2019.
renovate refinery Technip, along with Tecnoconsult and Y&V Group, has been awarded a USD700million contract to refurbish an idle refinery in Aruba.
www.heavyliftpfi.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148