Currently, manufacturers


prototype. Further details on the project and its members are available at www. chipcheck.eu.


Te following are some useful things to consider during planning your counterfeit component strategy: • A simple approach to minimise counterfeit components passing through goods receipt to pro- duction is to create a component reference database.


Reference


components and images of known good components can be used for future comparison. Reference component details should be obtained when a component is known to be going obsolescent, experiences long lead times, becomes difficult to obtain or is found to be in circulation as a counterfeit product


• Where components are being used in existing products or being considered in new products that are single source, on long lead times they should be added to the component database. Where components are


considered to


be high risk, are knowingly pur- chased from a new source or the supplier has not been previously qualified, reference samples must be obtained for review and pos- sible testing


• A golden board assembly is oſten held in manufacture as a reference for build quality or as an inspec- tion reference and could be used by goods receipt staff. A refer- ence source/photo guide should be compiled of existing qualified manufacturers’


logos, packing


labels, SMT reel labels and outer packing labels for use at goods receipt inspection


• Select and appoint an indepen- dent laboratory to conduct com- ponent testing when specialist tests may be required for indepen- dent verification. Provide an open order with the company so that urgent testing is not held up with internal paper work problems. 


cannot check all


components at goods inwards, even if they wanted to.


Bob Willis will be running the “IPC & NPL Process Defect Clinic” live at APEX 2011 in Las Vegas along with four training workshops,


one covering counterfeit


components and practical testing of parts. Join members of the NPL Team for free advice on process rejects and failures or go to http://defectsdatabase.npl.co.uk Bob has also published his 2011 online training webinars, over


20 design and process


topics at http://www.bobwillisonline.com/ training.asp Bob is a process engineer providing


engineering support in conventional and surface mount assembly processes.He runs production lines for suppliers at exhibitions and also provides seminar and workshops worldwide. www.askbobwillis.com


www.globalsmt.net


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80