This page contains a Flash digital edition of a book.
der the State of Ohio’s Innovation Ohio Loan Fund, which allows MesoCoat to complete construction and equipment installation of its first full-scale clad pipe manufacturing facility in the state. Abakan expects the construction and installation to be complet- ed in December. The facility should begin commercial production in March 2013.


Expansions


Promess Inc. (Brighton, MI) has completed construction of a new, 25,000-ft² (2325 m²) manufacturing facility on its current headquarters cam- pus in Brighton, MI. This new facility will help Promess meet its current record- setting product demands. The 28-year- old firm develops, manufacturers and markets its family of sensing devices, electronics, assembly presses and test systems on a global basis. “Construction of this project is a clear demonstration of our optimism about the future of manufacturing and our role in support- ing that future with real-time assembly and functional testing technologies,” said Promess president Glenn Nausley. Greenleaf Corp. (Saegertown, PA)


continues its global sales network expan- sion by welcoming two new distributors in the UK. Greenleaf has added Peter Campbell (Sales) Ltd. and Matrix Tool- ing Services to its distribution network. Headquartered in the US with sales offices in Schimmert, The Netherlands, and Hunan Province, China, Greenleaf has been a leader in cutting tool technol- ogy since 1945. Greenleaf has distribu- tion in over 30 countries worldwide.


Events


2012 PLM Road Map: The rapid pace of technological change in manufactur- ing took center stage at CIMdata Inc.’s (Ann Arbor, MI) 2012 PLM Road Map


annual conference held in Plymouth, MI, last month, focus- ing on new product lifecycle management (PLM) strategies for managing the manufacturing global IT and engineering enterprise. More at http://tinyurl.com/plmmfg.


TCI Machine-Ready Blanks Can Help.


Increase throughput by 25% or more with TCI Machine-Ready Blanks. With one P.O., eliminate grinding / squaring operations and outside processing. Use the time you save for more productive use of your CNC equipment – adding to your bottom line.


  


      parallelism– deburred and cleaned


     


Call today, or visit us on the Web to Request a quote and sign up for a FREE Webinar, How to Increase Throughput and Profits


Good Parts. On Time. Period.


Value Added Materials Distributor


 Authorized Distributor


MEMB E R  


November 2012 | ManufacturingEngineeringMedia.com 21


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124