This page contains a Flash digital edition of a book.
special feature


data centres Simple planning


The ultimate goal in data centre networks is to have zero downtime or ‘extreme’ network availability. In a risk averse environment with very strict schedule constraints and budgets, demanding reliability and performance without compromise is a must. Today, suppliers of network systems deliver additional pre-terminated patch cords and/or pigtails. The Belden solution is referred to as ‘pre-term made easy’ because it brings simplicity to the configuring and ordering process and it offers ease of installation through flexible cable assemblies and plug-and-play connectivity. Furthermore, with simple planning, fast delivery, up to 90 per cent reduction in installation time and labour cost, virtually no testing or troubleshooting required, Belden’s pre-terminated cabling system delivers the promise of pre-terminated cabling systems: dramatically reduced installation time, cost savings, and the reliability and performance of factory terminations – all without compromises or trade offs.


Advantages of pre-terminated cables include easy configuration, with only a few standard components to choose from to build an entire system, easy installation, built-in reliability with ultra robust assemblies and connectors, and guaranteed Category performance with test results supplied with each assembly.


Also, the simplicity of the components means energy and waste savings throughout the manufacturing and supply chain process. For further


information visit: www.beldensolutions.com


Ready for anything


The data centre is the focus of exponential increases in computing and power storage, and the source of the flood of streamed media and content. From the grandest custom facility straddling national power and telecoms nodes, to the simplest server room, Corning Cable Systems has a valuable solution.


Corning’s LANscape Pretium solutions ensure your data centre is ready for what’s now and what’s next including the products, services and support needed to design, implement and maintain your data centre infrastructure. The Plug & Play Universal systems are factory terminated optical fibre cabling systems designed to improve performance for the increasing demand for high speeds in data centre LAN/ SAN, enterprise building backbone and fibre-to- the-desk applications. All Plug & Play systems are equipped with Corning ClearCurve 50µm ultra bendable fibre (OM3/OM4), 100Gb ready and benefit from the Universal wired modular system components, doing away with polarity concerns. For further information visit: www.corning.com


FORMULA FUSION


Fusion in association with NCN presents


Your chance to compete in the Formula Fusion Karting Championship driving karts up to 80mph around some of the most prestigious outdoor race circuits with a prize of a Goodwood 5 Supercar driving experience for the champion


Regional Qualifi ers 2011: Thruxton (Hants) – 15 April Buckmore Park (Kent) – 20 May Teesside Karting (Teeside) – 10 June Glan Y Gors Park (North Wales) – 15 July Whilton Mill (Northants) – 19 August


Grand Final: Rye House (Herts) – 16 September


See website for full information and terms and conditions


www.millsltd.com 020 8833 2626


www.nimans.net 0161 9251980


Want to take part? Register your interest now at www.fusiondatacom.com 2538 Fusion Karting Ad2.indd 1


An ‘altogether better’ solution for structured cabling, fi bre optic and coax solutions.


• Structured Cabling • Fibre Optic Cabling • Voice Products • Coax & AV Cabling


• Cabinets & Enclosures • Cable Management • PDUs


Offi cial Fusion Distributors:


1/2/11 15:58:21


FREE ENTRY TO KARTING


CHAMPIONSHIP! STARTS APRIL 2011


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52