HealtH Matters 49
grEEn mattErs
rates with failure to achieve these rates this size of programme has been established
“It is the baseline use of
resulting in financial penalties to them. and senior management commitment is
the Hse south region has been chosen demonstrated by their representation of the
light, heat and cooling
to pilot the project with all the sites within project steering Committee.
this region forming part of the tender. Hse a draft Contract Document has now
that accounts for estates working with Hse Procurement will been issued and later this year we will move
approximately 70 per
manage and deliver the contract. the to the Invitation to Tender stage followed by
infrastructure necessary to efficiently deliver the contract signing.
cent of our energy use
and it is here that savings
CaVan general hoSPital energy eFFiCient
must be made.”
lighting ProJeCt
an energy efficient lighting project was recently developed for Cavan General Hospital.
to grow, particularly in the acute hospitals The project was managed and delivered by HSE Estates Dublin North East, through
sector. the introduction of additional energy its Kells office. The main objective of the project was to maximise the energy efficient
intensive equipment through programmes benefits of the lighting within the hospital with minimum disturbance to healthcare
such as the National Programme for services. existing indoor corridor lights and outdoor street lights were replaced with
Radiation Oncology (NPRO) will increase energy efficient equivalents.
this demand for energy, however it is the
baseline use of light, heat and cooling that the energy efficient lighting project consisted of the following works:
accounts for approximately 70 per cent of Street lights lamps were replaced by Philips 55w Pl-l (CFl) lanterns.
energy use and it is here that savings must Floodlights Metal Halide Floodlights were replaced by more efficient leD Floodlights.
be made. Corridor lighting T8 light Fittings were replaced by more efficient T5 light Fittings
In developing an energy reduction complete with daylight sensors in all appropriate areas.
programme, the imperative was to review Main reception lobby Incandescent bulbs were replaced with lED Downlights.
the Hse energy consumption patterns with nightlights CFl nightlights incorporated into existing light-fittings were replaced by
a view to developing a strategic standalone leD nightlights.
programme for reduction. this programme
must give a clear corporate direction which the project has the potential to bring about a seven per cent reduction in the hospital’s
will take account of the underlying electrical running costs and CO
2
savings of 134 tonnes per year. Savings could be
principles of the National Energy Efficiency greater when you take into account those that will be attributed to corridor lights
Action Plan 2009 – 2020 and it must be operating with daylight sensors. an added benefit is that the light level in the corridor
solidly based on achieving success areas has been vastly improved resulting in a light level of 200 lux being achieved in
through energy efficiency principles. some corridor areas with a reduced number of light fittings operating.
the key programme objectives are to: Overall, there have been very positive reactions and feedback from staff across all
• Achieve energy reduction over the current disciplines within the hospital to the improved lighting aesthetics.
energy usage for each year and deliver
savings back to the Hse.
• Demonstrate the commitment of the HSE
to eU and national energy plans through
socially responsible procurement and to
demonstrate its energy leadership
a fundamental principle of increasing
energy efficiency is to deploy cutting edge
technology coupled with experts in the
energy management field who will interpret
these findings and implement actions. We
have set about incorporating this principle
into a contractual agreement which will
commit the successful candidate to
achieving pre-agreed energy reduction
HM Iss6.1 p1-70.indd 49 12/03/2010 15:16:12
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132